Solution : https://service.sap.com/sap/support/notes/978159 (SAP Service marketplace login required)
Summary :
SAP Note details issues where Profit Center (PRCTR) or Partner Profit Center (PPRCTR) incorrectly derives during transfer postings with MB1B, MIGO, or deliveries from release 470 onwards. Specifically, Profit Center determination during transfer postings depends on material valuation (WERTU = X). For BSX postings, the system assigns the material master’s Profit Center if the BSX account is not a cost element. For valuated special stock, Profit Center assignment follows the related special stock details (see note 530578 for further information). For GBB postings, if the account is a cost element in controlling, the Profit Center of the CO object is used; otherwise, manual input determines Profit Center, falling back on the material master's Profit Center if unspecified. The logic also applies to business areas (GSBER and PARGB). Correction implementation is advised in solution section.
Key words :
solution implement attached corrections, manually entered profit center, manually assigned profit center, prerequisites program error, valuated special stock, partner business area, symptom profit center, partner profit center, profit center assignment, statistical cost element
Related Notes :
806729 | Dummy Profit Center for GBB line during Transfer Postings |
754651 | System error in prog. LPCRWF03 at VL02N assessm. runs KDAUF |
649970 | Determination of Profit Center during transfer postings |
644682 | MB1B: Manually entered Profit Center is not saved |
530578 | Special stocks in PCA |