Solution : https://service.sap.com/sap/support/notes/86362 (SAP Service marketplace login required)
Summary :
This SAP Note addresses an issue in the preliminary order cost estimate process within SAP Controlling (CO), where itemization items with a zero value are not recorded in the controlling object. Consequently, this prevents the computation of quantity-based overheads for such items. This problem is due to a design flaw in the system. The recommended solution involves modifying the source code of program LCK10FOR, with specifics provided in the attached document. Relevant for cost estimates in production and process orders, and networks.
Key words :
additional key words cost estimate, preliminary order cost estimate, quantity-based overheads, prerequisites design error, itemization item equals 0, production order, process order, controlling object, solution change, source code
Related Notes :
86613 | Message CK466 -> No price for confirmation |
81409 | Error CK465 with goods receipt for production order |
62777 | Costing log message CK361-Costing item wrong |