SAP Note 555176 - Late price change

Component : Actual Costing/Material Ledger - Price Changes

Solution : https://service.sap.com/sap/support/notes/555176 (SAP Service marketplace login required)

Summary :
This SAP Note addresses limitations in material price changes under specific conditions affecting materials with actual costing and price determination method 3. Changes are restricted after certain transactions such as goods movements and invoice postings within a period, or following the closure of previous period entries. It outlines corrections within SAP modules (SAPLCKM8, SAPLCKM8N, etc.) and function modules such as CKML_F_DOCUMENT_PRICE_CHANGE to enable price adjustments despite these restrictions. Support package levels influence the deployment of these corrections. Handling procedures emphasize careful application primarily at period start to avoid valuation errors. Additional activators for subsequent price adjustments are detailed, ensuring operational awareness and compliance.

Key words :
it_kalnr type ckmv0_matobj_tblit_lakalnr type ckmv0_laobj_tbl     optionalir_categ type ckmv0_yt_categ    optionalir_ptyp type ckmv0_yt_ptyp    optionalir_bvalt type ckmv0_yt_bvalt    optionalir_keart type ckmv0_yt_keart    optionalir_mlcct type ckmv0_yt_mlcct    optionalir_kkzst type ckmv0_yt_kkzst    optionalir_patnr type ckmv0_yt_patnr    optionalir_dipa type ckmv0_yt_dipa    optionalir_curtp type ckmv0_yt_curtp    optionalenter, et_old_keph type mlccs_t_kephet_new_keph type mlccs_t_kephtable parameter, ckmlpp-poperi_between_1_and_2 type char01i_untper, sym  text                                        dlen  mlen218  subsequent price change                    19    302, type optionalit_ckmlcr_old, actual cost component split documents, price determination structure view, subsequent price change introduced, choose 'default planned prices', cost component view

Related Notes :

757732INFORMATION: Using the dynamic release
588155MR21: Dump w/subsequent price change in material ledger
585059MR22 after installation late price change: C+099
583221MR21: Incorrect period status after price change
574930Resetting material ledger status
398145INFO: CO-PC-ACT (price change/release)
190707Period status of the material ledger