SAP Note 530563 - WIP calculation: Status DLV and TECO

Component : Product Cost by Order -

Solution : https://service.sap.com/sap/support/notes/530563 (SAP Service marketplace login required)

Summary :
This SAP Note explains the WIP calculation for orders with DLV (delivered) and TECO (technically completed) statuses, clarifying that these statuses do not automatically update by period. Instead, specific dates associated with these statuses determine the WIP calculation. For DLV, the key date is stored in AFPO-LTRMI and updates with each delivery; subsequent deliveries can alter this date. For TECO, the critical date is in AUFK-IDAT2, set when the order achieves TECO status. WIP calculation hinges on whether these dates align with the periods under consideration, overriding the mere presence of DLV or TECO statuses.

Key words :
database field aufk-idat2, database field afpo-ltrmi, field afpo-ltrmi, wip calculation, manufacturing orders, status dlv, technically completed, terms kkax, kkao solution, statuses dlv

Related Notes :

539947Status in the results analysis and WIP calculation
83914Treat DLV/TECO for settlemnt/var./WIP calc. equally
51670