Solution : https://service.sap.com/sap/support/notes/491966 (SAP Service marketplace login required)
Summary :
This SAP Note addresses an issue specific to IS-OIL / IS-MINE environments where PVR volume calculation errs if VL documents include NGL material at the MP level. The root cause is identified as a lack of processing logic for actual volumes at MP level. The resolution involves implementing the missing logic into the PVR calculation function. Users should apply Transport SOGK008527, carefully following the correct sequence as advised in SAPnet Notes 387861 and others, ensuring this fix is only applied on systems with IS-OIL / IS-MINE installed to avoid severe system damage.
Key words :
~ftp/specific/isoil/46c/notes/note, measurement point level records, -oil-pra-rev-val, solution added missing logic, pvr volume calculation function, -mine-specific note, pvr calculation function, pvr volume calculation, process actual volumes, important supplementary information
Related Notes :
491815 | IS-OIL / IS-MINE: CRTs 26-28 for SAP_APPL |
387861 | Order of IS-OIL / IS-MINE 4.6C Notes (SAP_APPL) |
47531 | IS-OIL / IS-MINE / IS-CWM correction guideline |