SAP Note 438362 - Plnd order: Adjusting basic dates in cap.requirmnts planning

Component : Scheduling - Capacity Leveling

Solution : https://service.sap.com/sap/support/notes/438362 (SAP Service marketplace login required)

Summary :
In situations where an operation from a planned order is deallocated and subsequently redispatched in mass planning environments, an issue causes the operation to not be dispatched successfully despite a positive indication in the planning log. This results in an unintended gap in the schedule. The problem stems from the scheduling type parameters used, and the interfacing with function module CX_CRP_PLANNED_ORDER_SCHEDULE needs adjustment. Specifically, modification of import parameter I_FLG_CAPAPL from default blank value to 'X' ensures the operation is dispatched appropriately. Related SAP Note 438291 also provides relevant guidance for this scenario.

Key words :
solution change import parameter i_flg_capapl, additional key words cm21, cm61s-flg_capapl default 'x', cm61s-flg_capapl default ' ', function module cx_crp_planned_order_schedule, order finish date, affected operation remains, affected operation, planned order, mass planning

Related Notes :

438291Planned order (Conversion): Scheduling type with times