Solution : https://service.sap.com/sap/support/notes/410619 (SAP Service marketplace login required)
Summary :
SAP Note assists in canceling the release of cost estimates by removing the anchor from the material master or material ledger and changing the status from 'FR' to 'KA'. This allows either the flagging or releasing of current, future, and past standard cost estimates. The applicable transactions include CK24, CK40N, and others. Prerequisites involve having released cost estimates with an 'FR' status, and manipulation requires the 'REDO' code. Implementation, restricted to valid exceptions, requires function modules (e.g., CK_F_GET_PARAMETER_FOR_REDO) in specific SAP Releases like 4.0B and 4.6C.
Key words :
material master reference -future standard cost estimate -current standard cost estimate -previous standard cost estimateo enter, future standard cost estimates, previous standard cost estimates, p_redo type xfeld ck_f_set_param_for_redo import-parameter, choose option -cost estimate, material master reference', material master/material ledger, mode 'cost estimate, additional key words ck24, cost estimate
Related Notes :
757732 | INFORMATION: Using the dynamic release |
452099 | Release cancellation: generated source code available |