Solution : https://service.sap.com/sap/support/notes/331989 (SAP Service marketplace login required)
Summary :
This SAP Note addresses a specific issue within the IS-OIL / IS-MINE environment, particularly pertaining to the Hydrocarbon Product Management (HPM) and the Quantity Calculation Interface (QCI). It corrects a problem where the system was not allowing foreground quantity calculations during PP confirmations via a pop-up window. Implementing this note enables configuration through transaction O581 to control this pop-up feature for the quantity calculation in production and process order confirmations. Applicable to specific releases (4.6B and 4.6C), this solution includes downloading and importing given transport files from listed SAP servers. Strict adherence to pre-requisites, and sequence of installation as per linked Notes, is advised to avoid potential system damage.
Key words :
window pp pp-pi process order production orderconfirmation reprocessing co15 cork cogi, transactionsfor creating production ordersor process order confirmations, ~ftp/specific/isoil/46b/notes/note, ~ftp/specific/isoil/46c/notes/note, hydrocarbon product management function qci, receiving plant / storage location combination, additional key words hpm, prerequisites missing control statements, hpm quantity calculation interface, pp confirmations
Related Notes :
529110 | HPM(Hydrocarbon Product Management) and PP and others |
387861 | Order of IS-OIL / IS-MINE 4.6C Notes (SAP_APPL) |