SAP Note 23278 - MD01, MDBT: Performance during MRP run

Component : Bedarfsplanung - Classification

Solution : https://service.sap.com/sap/support/notes/23278 (SAP Service marketplace login required)

Summary :
The SAP Note addresses performance issues in materials planning, identifying multiple organizational and technical factors affecting runtime. Key organizational aspects include the type and mode of planning runs, updating frequencies in the Purchasing Information System, and the impact of parallel processing. Technical facets include hard disk response times, database management, buffering, and specific program errors. Solutions are recommended through note implementation and system adjustments. Organizational measures like reduced planning horizon and selective regenerative planning are advised alongside database and hardware assessments to optimize materials planning performance.

Key words :
production -> material requirements planning -> planning ->    mrp calculation -> define planning horizon, production -> material requirements planning -> planning ->      scheduling, capacity parameters -> define scheduling parameters, statistics update takes place automatically, terms material requirements planning, buffering sap number rangesb4, incorrectly configured hard disks, a5during lead time scheduling, specific performance problems solution, create mrp lists

Related Notes :

766827Composite SAP note: Performance SCM 4.0
540393MD02: Poor performance of operative planning as of 4.6C
444287Checking the index storage quality
440651Performance problems when you access views
402808ECH: Performance improvement ECM_PROCESSOR_ON_LIST
382541ECH: Performance improvement of effectivity during MRP run
377291ECH: ECH:performance improvemnt in ECM_PROCESSOR_ON_LIST
311483Class node: Material Requirements Planning
304364Performance when reading the configurable objects
211396Changing dependency and planning file entries
204517MRP: Performance problems - typical causes
184171MRP planning run with configurable materials
181271Performance problems in MRP run
171919Performance Optimization: Low Level Configuration
162100Performance in Low-level configuration
135788Planning mode in material requirements planning
112765Performance planning run / stock transport orders
78115Planning file with plant
78091Planning mode 1 and change issue storage location
77577Performance mat.req.s planning, production versions
663793.1G: Incorrect relationships in MRP, performance
63395Materials planning (RMMRP000): Termination CO888
63055Performance: CO_BT_DATA_RESET
53090Planning performance, stock transport orders (3.0C)
51715Planned order: Reset buffer tables
509053.0D,3.0E IMPORTANT: Planning run performance
49585Classif.system: change from 2.2 to 3.0 (and higher)
49429Performance: No routing check
49074MD01: Performance: Log is initialized
47288Improve performance in scheduling
46271Classif. system:correction of object search in 3.0E
34595Performance: TIME_OUT during scheduling
34265MRP: Intervals of available capacity are not observed
31381Poor performance in materials planning
29942Performance loss after 2.2F/3.0* upgrade
25732Scheduling MD01/CO01/CO02: Performance or Error