Solution : https://service.sap.com/sap/support/notes/23278 (SAP Service marketplace login required)
Summary :
The SAP Note addresses performance issues in materials planning, identifying multiple organizational and technical factors affecting runtime. Key organizational aspects include the type and mode of planning runs, updating frequencies in the Purchasing Information System, and the impact of parallel processing. Technical facets include hard disk response times, database management, buffering, and specific program errors. Solutions are recommended through note implementation and system adjustments. Organizational measures like reduced planning horizon and selective regenerative planning are advised alongside database and hardware assessments to optimize materials planning performance.
Key words :
production -> material requirements planning -> planning -> mrp calculation -> define planning horizon, production -> material requirements planning -> planning -> scheduling, capacity parameters -> define scheduling parameters, statistics update takes place automatically, terms material requirements planning, buffering sap number rangesb4, incorrectly configured hard disks, a5during lead time scheduling, specific performance problems solution, create mrp lists
Related Notes :
766827 | Composite SAP note: Performance SCM 4.0 |
540393 | MD02: Poor performance of operative planning as of 4.6C |
444287 | Checking the index storage quality |
440651 | Performance problems when you access views |
402808 | ECH: Performance improvement ECM_PROCESSOR_ON_LIST |
382541 | ECH: Performance improvement of effectivity during MRP run |
377291 | ECH: ECH:performance improvemnt in ECM_PROCESSOR_ON_LIST |
311483 | Class node: Material Requirements Planning |
304364 | Performance when reading the configurable objects |
211396 | Changing dependency and planning file entries |
204517 | MRP: Performance problems - typical causes |
184171 | MRP planning run with configurable materials |
181271 | Performance problems in MRP run |
171919 | Performance Optimization: Low Level Configuration |
162100 | Performance in Low-level configuration |
135788 | Planning mode in material requirements planning |
112765 | Performance planning run / stock transport orders |
78115 | Planning file with plant |
78091 | Planning mode 1 and change issue storage location |
77577 | Performance mat.req.s planning, production versions |
66379 | 3.1G: Incorrect relationships in MRP, performance |
63395 | Materials planning (RMMRP000): Termination CO888 |
63055 | Performance: CO_BT_DATA_RESET |
53090 | Planning performance, stock transport orders (3.0C) |
51715 | Planned order: Reset buffer tables |
50905 | 3.0D,3.0E IMPORTANT: Planning run performance |
49585 | Classif.system: change from 2.2 to 3.0 (and higher) |
49429 | Performance: No routing check |
49074 | MD01: Performance: Log is initialized |
47288 | Improve performance in scheduling |
46271 | Classif. system:correction of object search in 3.0E |
34595 | Performance: TIME_OUT during scheduling |
34265 | MRP: Intervals of available capacity are not observed |
31381 | Poor performance in materials planning |
29942 | Performance loss after 2.2F/3.0* upgrade |
25732 | Scheduling MD01/CO01/CO02: Performance or Error |