SAP Note 164861 - SUM: PIR all existing notes

Component : Industry-Specific Component Apparel and Footwear - Production Planning

Solution : https://service.sap.com/sap/support/notes/164861 (SAP Service marketplace login required)

Key words :
additional key words j3a1, planned independent requirements, existing pir notes, note -fixpack 3, highly recommended, implement note 165035, summarizing note, prerequisites solution, attached notes, notes 123638

Related Notes :

307387PP/ATP:No confirmtion evn though qties are availble
302396CO01 TABLE_INVALID_INDEX - DUMP
202836ATP: Short dump during check in demand management
186123AFS SOP-PIR interface: BDC termin. (in background)
185331J3A1 not BDC-supported due to LEAVE TRANSACT.
180007Withdrawal quantity in planning,incorrect display
165035
164733Sales orders with final goods issue will be recognized!
163351Raise NO_DATA_RECEIVED is raised although it's not necessary
162064Error message 8J406 during mrp run
160910Translation and status features
160292Batch input ability of Transaction J3A1 (PIR) II
160183Consumption of forecast after note 155567
159615Date_to : stock elements ignored
159561Error during EDI inbound processing of sales order
158974Corrections for note 155911 GI processing & forecast
157502Stock-/requirements list - to date introduction
155911Changing forecast processing during goods issue
155454Wrong quantities when rounding profile is used!
154544SOP-PIR Mass transfer:Wrong entry in SOP screen II
154311AFS: Performance goods issue for delivery note
153929PIR:Reorganization program zeroed the withdraw.qty.
153001AFS PIR: F4-Help (Requirements date) on MAT-level
152718PIR: "Active-Flag" goes inactive after Presizing
152305AFS PIR: F4-Help (Requirements date) on SKU-level
152092Logfile to trace possible inconsistency in J_3ABDBS/BDBS_M/B
151758AFS: Performance goods issue PIR reduction
150966FPT - Active Flag at Planned Independent Requirements
150447Extension of user exit for PIRs (planned indep. requirem.)
148173AFS Mass Processing SOP-PIR (Background processing)
146163AFS PIR:J3A2 (Display) MM/PP-Status message problem
144900AFS: Consumption of forecast at goods issue
144834GI update termination : J_3APBBD primary key extension
144246Forecast will not be displayed in MD04 outsize SLH
143747PIR consumption for make to order / third party
143613AFS SOP-PIR mass transfer:Wrong entry in SOP screen
141699AFS: User exit in the PIR maintaining
140873Batch input ability of Transaction J3A1
140498Wrong mapping with different stock categories!
140404Display forecast from MRP list.
139903Lotsize procedure X1 and forecasts in blocked stat.
139251AFS SOP-PIR mass transfer: wrong screen for batch
139022PIR/MRP:Reqm.are not netted of with.qty./additional
137392AFS: Batch Input for mass transfer from SOP to PIR
137324Forecast will be reduced although it shouldn't
136978PIR consumption and sort order stock/requ. list
136792AFS PIR/MRP:Rquirem.are not netted of the withd.qty
136771PIR no switch to forward/backward consumption
136760Requirement/supply matching & sort order
136589Creation indicator for order acceptance
136200Safety stock is ignored PBED version 99
134379Repair program for note 132397 PIR's (new function)
133999Enhancement to PIR consumption improper working
132750Planned independent requirements for non existant category
132397Reduction of independent requirements/rush order
131914PIR Consumption does not work properly
131765AFS SOP-PIR-Interf.:Miscalculation after TSFR to Demand MNGT
130928AFS plannd reqmnts:Ovrview reads no selctn criteria
127958PIR are not reduced in MD04/MD05
127421PIR: Screen is ready for any entries after reorg.
127299PIR Consumption with split delivery
126606PIR: Runtime error in TC: J3A1
126267PIR: Check the MM/PP-Status in the TC: J3A1
125788Independent requirements consumption reverse order
123850Sequence of sales orders consuming PIR
123638Reactivation of PIRs after maintaining PIRs
123522
122454Maximum lotsize to small
122299Support the flag for PIR reduction from SD
117749MRP: PIR consumption with split delivery
115747MRP : display PIR reduction
113596Reorganisation of planned independet requirements
113232Consumption of PIR in any status not only in 'T'.