Solution : https://service.sap.com/sap/support/notes/1582525 (SAP Service marketplace login required)
Summary :
This SAP Note discusses configuring Change and Transport Management for SAP BusinessObjects Planning and Consolidation (BPC) for Microsoft, versions 7.5 SP06 or 10.0 SP01, specifically employing Enhanced Change and Transport System (CTS+). Key prerequisites include having SAP Solution Manager 7.1 or higher equipped with relevant CTS_PLUG AddOns and the deployment on supported system versions. System requirements for managed systems emphasize compatible SAP Java Connector, JDK, and SAP DI Tools versions. The CTS+ configuration guide for BPC MS is accessible via specified links, with emphasis on compliance with SAP Solution Manager system configurations.
Key words :
rid=/library/uuid/f0866ff9-7693-2e10-b68b-b0f0cc9bb2eeit, transaction code smms -> parameters -> display, sap product version sl toolset 1, higher- sap solution manager 7, sap solution manager supports, sap solution manager root, application lifecycle management reason, microsoft windows batch file, microsoft windows operating system, microsoft windows operating systems
Related Notes :
1612314 | Planning and Consolidation 7.5M SP06 Central Note |
1573539 | Planning and Consolidation 10.0 SP01 for Microsoft |
1533059 | Installing the SAP CTS plug-in |
1348932 | CTS+: Prerequisites for transport strategy CREATE |
1348927 | CTS+: Default value for description of transport request |
1278181 | Usage of CTS+ Command Line Tool (Export) |
1170359 | Tracing the deploy proxy |
1077727 | SAP JCo 3.0 release and support strategy |
1003674 | Enhancement for non-ABAP systems in CTS |