Solution : https://service.sap.com/sap/support/notes/154679 (SAP Service marketplace login required)
Key words :
additional key words hot package 52, applied hot package 52, earlier hot package, hot package 47, hot package 52, hot packages > 52, individual notes, source code, longer contained, prerequisites
Related Notes :
| 150344 | Transf.to demand management:incorr.unit conversion |
| 145254 | Unit conversion when transferring in demand magmt |
| 144232 | Incorrect factory calendar is used |
| 141830 | Delta planning: incorrect lock entry in MC93 |
| 138748 | Mass processing: Incorrect lock entries |
| 138662 | Change product group and planning tables |
| 137294 | Error message MA120 for transfer from CO-PA to SOP |
| 134903 | Query 'Save planned values' in display mode |
| 134421 | Delta planning: Planning start for daily planning |
| 134211 | Planning hierarchy:Performance improvement-graphic |
| 134033 | Planning hierarchy: Proportions calcultd incrrectly |
| 133795 | Mass processing: incorrect status in table LISPLF |
| 133793 | MC94: Fifth column cannot be selected |
| 133598 | Material plant combination does not exist |
| 133157 | Missing message in the background log |
| 132494 | Forecast:incorrect period with fiscal year variant |
| 131924 | Incorrect data when transferring CO-PA to SOP |
| 131816 | Planning table: Totals column for capacity lines |
| 131731 | Improvement performance calculation of proportions |
| 131728 | Macro: program termination during aggregation |
| 131582 | COMPUTE_FLOAT_ZERODIVIDE: Transfer CO-PA to SOP |
| 131460 | Planning table: Number of future periods < 5 |
| 131421 | Termination for statstics graphic-too much data ... |
| 131405 | Error messge MA574 when transferring routing f.COPA |
| 130894 | Lock in spite of negative authorization check |
| 130119 | Planning table: Characteristic display is incorrect |
| 129714 | Report RMCP6TST - incorrect sorting |
| 129680 | IDoc SOPGEN01: Incomplete actual data transfer |
| 129350 | CONVT_OVERFLOW during transfer to demand management |
| 129325 | Planng table:incrrct historicl values drng forecast |
| 128622 | Enhancement of the sort function of RMCP6TST |
| 128305 | Two-step planning type:Incorrct display of members |
| 127242 | MC8G:Missing restriction options for bkgd planning |
| 126586 | MC94: Interactive graphics: Scroll and copy |
| 125503 | Product group : Transfer to demand management |
| 125350 | Mass processing: transfer to demand management |
| 124327 | Incorrect conversion factors in forecast |
| 123772 | Transaction MC8M: incorrect warehouse stocks |
| 123532 | Planning hierarchy: Characteristics are not generic |
| 123065 | Planning table: 0 column after period splitting |
| 122255 | Error 6P511 when transferring to demand management |
| 122160 | List of inactive versions not sorted |
| 122027 | EXCEL interface: Incorrect transfer values |
| 120647 | Planning table: Incorrect unit conversion |
| 120204 | Online - Prognose bricht mit Message MA817 ab |
| 119458 | S076:Transfer to demand management w. prod. version |
| 118512 | Previous year determined incrrctly for actual data |
| 118453 | Scrolling in the planning table |
| 118026 | Product group: Unit conversion for material |
| 117402 | SOP: Planning type without warehouse stock |
| 116343 | Incorrect periodicity for product groups |
| 115812 | Levl-by-level plnning:Plnning start i.daily plnning |
| 115257 | Change period division in the planning table |
| 113988 | Macro in background: SAPSQL_ARRAY_INSERT DUPREC |
| 113911 | Error message MA554 whn transferring to demand mgmt |
| 113907 | Error message when setting header information MC94 |
| 113879 | Incorrect data when transferring SIS to SOP |
| 112204 | Performance improvement for report RMCP6FLS |
| 111961 | Capacity requirements are calculated incorrectly |
| 111847 | Planning table: Unit conversion with events |
| 111398 | IDoc SOPGEN01: Inbound for information structures S032 and S |
| 111330 | Transaction BDMC: Info structure copy program |
| 111267 | Flag 'No Unit Conversion' ignored (MC7F) |
| 110844 | Dynamic determination of the production version |
| 110774 | RMCAMUSH: termination in routine 'GET_PLOB_FOR_KEY' |
| 109891 | Planning hierarchy maintenance:Base unit of measure |
| 109729 | RMCP6FLS: F4 input help for self-defined methods |
| 109512 | Maintain planning vers. texts/delete planning vers. |
| 109459 | Fixing of values in past-time periods |
| 109441 | Fixing and period selection in totals column |
| 108954 | IDoc SOPGEN01: Incorrect data transfer into the SOP |
| 108146 | IDoc SOPGEN01: Incorrect data transfer to SOP |
| 107858 | Transfer CO-PA to SOP: field Info structure deleted |
| 107678 | KSPP: Error message CR084 for task list type 'N' |
| 107094 | Number of decimal places for the relative event |
| 106635 | Plan. hierarchy maintnance:level-by-level plnning |
| 106423 | Planning hierarchy mainten.f.level-by-level plnning |
| 104981 | Planning hierarchy: deleting product groups |
| 104774 | IDoc SOPGEN01: timeout when posting Idocs |
| 104592 | Error in report RMCPSOPP: Master data generation |
| 103947 | IDoc SOPGEN01:Error info strcture copy program BDMC |
| 103939 | SOP forecast: model selection procedure 1 |
| 103137 | ALE: Field 'SSOUR' incorrectly filled in Idoc SOPGEN01 |
| 102875 | Planning table: not enough periods set up |
| 102058 | Incrrect capacity requirements for members of a PG |
| 102023 | Macro: Special operators L1, L4 and PR |
| 101871 | SOP: Copying with the mass processing function |
| 101672 | Planning table: short text for product groups |
| 101626 | Level-by-level planning: units conversion from to |
| 101592 | Performance:In dialog mode transfr o.demnd managmnt |
| 100902 | Planning table: flexible level-by-level planning |
| 100174 | Diff. period unit in two-step planning |
| 99952 | MC94: Forecast with automatic model selection |
| 99604 | MF50 and SOP: Excel connection |
| 97521 | Display selection |
| 97361 | Actual data: No warning in the change mode |
| 97306 | Delta planning: CALL_FUNCTION_CONFLICT_Type |
| 97237 | Data inconsistency after distribution of values |
| 97127 | Planning table: rounded forecast values |
| 97103 | Events during two-step planning |
| 96893 | IDoc SOPGEN01 - EDI: Syntax error in IDoc |
| 96764 | IDoc SOPGEN01: ALE transfer in SOP incorrect |
| 96558 | No unit conversion when copying from SIS |
| 96421 | Copying between info structures: no data |
| 96419 | High-level copying: endless loop |
| 96369 | IDoc SOPGEN01 - EDI: Syntax error in IDoc |
| 96276 | SOP:incor. mess. MA300 during cap. requrmnts. plan. |
| 95802 | Insert_Duprec when copying in the background |
| 95617 | Forecast:the most recent zero consumptions deleted |
| 95445 | SOP forecast: incorrect number of historical values |
| 95132 | Error mess.MA501 during transfer to demand managmnt |
| 95126 | Planning table: forecast for daily period unit |
| 94805 | Combinations of characteristics in background log |
| 94620 | Level-by-level planng:copying data f.product groups |
| 94474 | Performance - improvement when saving |
| 94241 | Planning hierarchy: Tools |
| 94148 | Transfer from flexible planning to demand managemnt |
| 94060 | Planning table: Display forecast version |
| 93936 | Planning hierarchy: incorrect copy function |
| 93891 | Program termination when scrolling repeatedly |
| 93788 | Error in transfer of CO-PA to SOP |
| 93726 | RMCP6BRU: incorrect text for the selected job |
| 93469 | Copy data: nothing is copied |
| 93437 | Period start determined incorrectly |
| 93413 | MC94: SAPSQL_ARRAY_INSERT_DUPREC |
| 93380 | Planning hierarchy: copying entire sub-tree |
| 93304 | Parallel planning w. 2 planning types in 2 sessions |
| 93279 | Program termination during forecast for help line |
| 93084 | Information on key figure in key figure view |
| 93065 | No change query when leaving the planning table |
| 92995 | Calendar year independent fiscal year variant |
| 92817 | Events in different languages |
| 92800 | Planning table: identical period texts |
| 92781 | Transfer SIS: date is later than planning horizon |
| 92336 | MF50: MS Excel termination due to incorrect path |
| 91239 | Capacity requirements planning: call for members |
| 91099 | Event display after deleting cumulative line |
| 91000 | Forecast:parameter optmztn changes trend value etc. |
| 90892 | Forecast: supplement f.model selection procedure 2 |
| 90882 | Master data generation: no data transfer |
| 90521 | Initial scrn rough-cut prdctn plang.: no scrolling |
| 90395 | Message MA 818 occurs when editing SOP forecast |
| 90346 | Two-step planning table: no data transfer |
| 90258 | SOP: MA120 when creating planning |
| 90171 | Line total with activated fixing |
| 90098 | Copying: changed planned unit is not considered |
| 89998 | Fixed issue line items are ready for input |
| 89875 | material-independent plant distribution for copying |
| 89873 | Mass processing: log is incorrect |
| 89867 | Mass processing: transfer terminates / ... |
| 89777 | Distributor function for fixed totals line |
| 89692 | F4-Help: Wrong text for planning type in dialog box |
| 89473 | Lvl-by-lvl planning: proport. for info structure |
| 89327 | Capcty reqs planning: incrct reqs after scrolling |
| 89108 | Fixing type from columns in the planning table |
| 88779 | MC94 => performance => read actual data |
| 88574 | Actual data in level-by-level planning |
| 88526 | Cap.rqmnts planning: incor.key figure in table SAUF |
| 88506 | Selected area Total is incorrect after distribution |
| 88502 | Endless loop for monthly company holidays |
| 88480 | Cap. requirements planning: display error after job |
| 88456 | Mass processing: planning job 'After job' |
| 88333 | Delta planning: not deactivated functions |
| 88294 | SOP: selective period division; disaggregatng month |
| 88253 | Unusual errors after changing information structure |
| 88194 | Key figure assignments: save also with 'Continue' |
| 87665 | Capa.req.plg.: wrong period for mat./PRT and costs |
| 87636 | Changing units: effect on opening balances |
| 87476 | Transfer prod.plan for material as proportion of PG |
| 87473 | SOP: Original stock level without decimal places |
| 87220 | Combinations of characteristics in key figure view |
| 87138 | Creating event: incorrect period indicator |
| 87079 | Planning table: totals column for key figures |
| 87058 | SOP - period tables are not sorted |
| 86973 | Product group read incorrectly for 'Week' period |
| 86939 | MA151 - T134 not maintained during planning call |
| 86780 | Setting header info selection for detail level |
| 86561 | Version copy between LIS and plan versions |
| 86493 | Copying with own copying method => confusing data |
| 86481 | Macro changes when changing the planning type |
| 86340 | Planning hierarchy: multi-level - delete |
| 86185 | Mass processing: transfer to demand management |
| 86183 | Capacity requirements from past periods |
| 86174 | Rough-cut planning profile: warning f. dif. units |
| 86122 | Copying existing 0-values from other infostructures |
| 86040 | Mass processing: Forecast with historical values |
| 85990 | Mass processing for S076 - standard SOP |
| 85934 | Chge Plan.Type:freely defined txt in line attribs. |
| 85804 | USER exit for header info: sequence control |
| 85655 | Start date of the planning periods is incorrect |
| 85654 | Setting the first column in background |
| 85493 | Batch f.lvl-by-lvl plann.w/o predef.strge periodcty |
| 85402 | Reading of actual data in product groups f.material |
| 85388 | Manual disaggregation in the selected area |
| 85386 | Totals column in the standard SOP |
| 85260 | Forecast: model selection procedure 2 |
| 85095 | Planning table: problems with unit conversion |
| 84515 | Info structure independnt copy: program termination |
| 84403 | Forecast: incorrect historical data |
| 84067 | Cap.rqmnts planning: display of MAT/PRT and costs |
| 83981 | Forecast deletes data records of other key figures |
| 83869 | Planung anzeigen: trotzdem Popup für Sicherung |
| 83753 | Capacity rqmnts planning after executing a macro |
| 83484 | Forecast: Short dump CONVT_OVERFLOW occurs during the foreca |
| 83446 | Create planning hierarchy: various errors |
| 83350 | Hide capacity -> Incorrect key figure view |
| 83323 | Saving a planning with planning type S076 |
| 83245 | Product allocations: collective note |
| 83071 | MC93/MC94: Disaggregation in level-by-lvl planning |
| 83038 | Planning table: Macro operator 'Line total' |
| 82997 | Error message MA102 incorrect |
| 82724 | Locking charact. combination during disaggregation |
| 82676 | MC8Q: Version identification is deleted |
| 82615 | Planning hierar. maint:Dialog box for portion total |
| 82611 | Planning table: Not enough periods ready for input |
| 82609 | Planning table: Unit conversion in totals column |
| 82553 | Invalid unit conversion for event line |
| 82536 | Copying in mass prcssng w/o specifying from/to-date |
| 82449 | Rough-cut planning profile is not deleted |
| 82407 | Cap. rqmnts planning w. rough-cut planning profile |
| 82249 | Internal error 046 when creating flexible planning |
| 82044 | Planning table: Planning is impossible for a period |
| 82027 | Forecast profiles: Storage period unit 'Days' |
| 81935 | No change query when leaving transaction MC94 |
| 81693 | Capa.req.s planning: Generate rough-cut plng profle |
| 81683 | Transfer of key figure units to rough-cut planning |
| 81511 | Product group: Units conversion for material |
| 80825 | Delta planning (planning table): Forecast |
| 80796 | Rough-cut planning profile: Unit display |
| 80550 | Planning table: Long text for period |
| 80307 | Setting up master data with method |
| 80265 | Creating key figure assignment for source = target |
| 80229 | Mass processing: MA347 (reason W) despite operation |
| 80197 | Wrong forecast periods in mass processing S076 |
| 79957 | Copy data: incorrect results |
| 79942 | Error or termination after calling the planning |
| 79861 | Changing forecast profile during online forecast |
| 79812 | Displaying forecast parameters with decimal places |
| 79802 | Termination when generating planning source code |
| 79747 | Transfer COPA --> SOP: wrong period unit |
| 79652 | EXCEL: Text lines from the planning table |
| 79484 | Planning table: Units from material master |
| 79404 | Multiple occupancy of available capacities |
| 79293 | Allocations: no coll. entries for customer column |
| 79211 | Rough-cut plg.profile:product grp/material confused |
| 79121 | Batch input: Executing macros w. historical periods |
| 79047 | MC90: No default value for requirements type |
| 78848 | Proportion: in background based on planning hierar. |
| 78665 | MC90: Transfer from planning table to demand mgmnt. |
| 78456 | Version: Possible entries pushbutton is incorrect |
| 78415 | Incorrect 0-columns input/display |
| 76906 | Forecast:Zero val.s at start of history time series |
| 76300 | 0 column in mass processing |
| 76197 | SOP forecast: consumption data not read |
| 75925 | Own task list type for S076: MA361 on new material |
| 75850 | Mass processing: Product group without members |
| 75316 | Unauthorized start transaction MC90 from trans.MC94 |
| 75245 | Zero column for macros with past columns |
| 74773 | Forecast: Additional information to Note 73474 |
| 74490 | Incorrect warehouse stock after period breakdown |
| 74472 | MC94+MF50: EXCEL interface: units of measure |
| 74434 | Distribution function in key figure view is incorrect |
| 74395 | Delta planning: Excluding aggregated information |
| 74375 | Mass processing: Delta planning -> no support |
| 74312 | Rounding error during disaggregation |
| 73987 | MC94 MF50: EXCEL: Periods shifted + termination |
| 73724 | Plng table: missing last period due to totals colmn |
| 73480 | Planning table: simultaneous unit change |
| 73474 | Forecast: most recent zero consumptions deleted |
| 73155 | Decimal places are not transferred |
| 73098 | Rounding error |
| 73003 | Event value is calculated incorrectly |
| 72823 | Macro execution with historical periods |
| 72604 | Block product group |
| 72281 | No fiscal year variant with a period |
| 72279 | Forecast: no model chosen |
| 71681 | Factory calendar ignored - IDoc SOPGEN01 |
| 70787 | Addition to note 69183 |
| 70680 | Job cannot be scheduled if no job name |
| 70608 | No model selected for model selection procedure 2 |
| 69874 | POI: Performance stock/requirement list IDoc LOISTD |
| 69504 | Forecast factory calendar not maintained completely |
| 69183 | Forecast: Error if weighting factor more than ten |
| 68250 | Performance: SOP Forecasting with fiscal Period |
| 67822 | Incorrect planning start for daily planning |
| 65529 | Flexible planning for LIS standard info.structures |
| 63233 | Error message missing during transfer from SIS |
| 61968 | MC94 Abort: SAPMMCP6 Screen source 0000 missing |
| 53554 | USER exit for header info EXIT_SAPMMCP6_004 |
| 46806 | Master data generation: 10000% instead of 100% |
| 43729 | MC94: batch input not processed invisibly |
| 40888 | Version copy - opening stock |