Solution : https://service.sap.com/sap/support/notes/144513 (SAP Service marketplace login required)
Summary :
During data transfer to demand management in SAP, withdrawal quantities, if present, are deducted from the transferred plan quantities. Consequently, only the net quantity—the difference between transfer and withdrawal quantities—is stored as the plan quantity in demand management. This subtraction does not occur with manual data entry via Transaction MD62. Users requiring alternative behavior can adapt the system through modifications. For optimal resolution, especially post Release 4.0, implement SAP Note 180999 before modifying as outlined in the current note, enhancing system accuracy in demand management processes. Keywords include withdrawal quantity, RM60FORC, RM60SIMU.
Key words :
additional key words modification, transfer quantity - withdrawal quantity, prerequisites solution carry, transferred plan quantities, withdrawal quantity, plan quantity, withdrawal quantities, difference quantity, attached modification, demand management
Related Notes :
793258 | Withdrawal qty during transfer to demand mgt (consulting) |
772857 | FAQ: Independent requirements reduction/withdrawal quantity |
666654 | Withdrawal quantity gets lost w/ distribution of zero qty |
390155 | MS64 and withdrawal quantity |
331696 | MS64 Incorrect quantities for withdrawal quantity |
328546 | Withdrawal quantities for daily schedule lines |
180999 | Demand management: Incorrect splitting of issue quantities |
170183 | |
145758 | Incor. planned independent reqmnts qty from network |