Solution : https://service.sap.com/sap/support/notes/119246 (SAP Service marketplace login required)
Summary :
This SAP Note addresses an issue in IS-OIL systems where the error message M7022 ('PU GR quantity exceeded by ...') is triggered during loading confirmation when the document quantity of a shipping notification in scheduling changes. The note is specific to IS-OIL modules and should not be applied to non-IS-OIL systems to avoid potential damage. The issue occurs if there's a change in scheduled quantity, e.g., from 100 to 101 liters. To resolve this, the transport SAPKI3H269 must be downloaded and imported as per the instructions in the note. Ensure application of the transport aligns with guidelines from relevant OSS Notes.
Key words :
~ftp/specific/isoil/31h/notes/note, system produces error message m7022, additional key words td, 'pu gr quantity exceeded, -oil-specific note, oss note 13719 describes, schedule isthen carried, important supplementary information, import transport sapki3h269, oss note 98642
Related Notes :
98642 | Order of IS-OIL notes 2.0d & 1.0d on R/3 3.1H (SP) |
47531 | IS-OIL / IS-MINE / IS-CWM correction guideline |