SAP Note 118623 - CO05: Different problems during collective release

Component : Order Execution - Inspection Lot Creation

Solution : https://service.sap.com/sap/support/notes/118623 (SAP Service marketplace login required)

Summary :
During collective transaction releases (Transaction CO05), specific bugs were detected: no purchase requisition is generated for non-stock component releases unless same material is added subsequently. Additionally, production order costs aren't transferred to sales orders, with costs defaulting to zero. Lastly, favored GR inspection lots fail to generate without active checks during production. This is tied to a programming error. Prior SAP Notes 91106, 84477, and 82848 have been superseded by this correction directive. Implement fixes from Notes 121538, 100217, 96304, 68989 before applying this note's program correction, which involves deleting specific source code blocks as directed.

Key words :
preferred gr inspection lots, additional key words co01, source code lines, respective sales order, sales order, collective release, purchase requisition, -stock component, system generates, transaction co05

Related Notes :

194389Collective processing of production orders in background
184825Collective release slow & uses up a lot of memory
151475CO05: Multple printout after Note 118623 implementd
137443COR5: Double print for process orders
135496Prod ord: No automatic print/incorrect hedr status
135262Update sales order during collective availability check
121538CO40: SAPSQL_ARRAY_INSERT_DUPREC in RKPF
100217CO41: CO 888 during collective conversion of planned orders
96304CO05: No release indicator in the collective order
91106CO05: Costs are not updated
84477No sales document update from collective release
82848CO05: No job order costing
68989Missing settlmnt receiver (material) for prod.orders