Diagnosis At least two worklist entries exist for the same material; both are tobe marked down identically. The material has markdown proposals at botha detailed level (such as generic material/color) and a rough level(such as generic material). The price-only material is only defined atthe detailed level, however. System Response The system converts the rough proposal to multiple proposals at a moredetailed level, based on the price-only material assignment. Thisresulted in a conflict with at least one proposal that was definedexplicitly at a more detailed level. Procedure To correct the error, do one of the following:
- Delete the markdown proposal that is flagged as incorrect at the rough
level.
- Enrich the incorrect markdown proposal again. Please note, however, that
this will overwrite the proposals that are already enriched at adetailed level.
|