Diagnosis The variable parameters are set in such a way that the system onlyselects sub-operations which are not yet finally confirmed and whosecontrol key specifies that they require confirmation. Procedure To confirm sub-operations that have been finally confirmed or that donot require confirmation, proceed as follows: Select the menu options "Parameters" => "Variable parameters" on theinitial confirmation screen. Take out the indicators "Open operations" and "Ops. req.conf." The change is valid for the current plant and order type. |