Diagnosis The variable parameters are set in such a way that the system onlyselects sub-operations which are not yet finally confirmed and whosecontrol key specifies that they can be confirmed. A sub-operation can always be confirmed providing the control key ofthe sub-operation allows confirmation. Procedure To confirm sub-operations that have been finally confirmed, proceed asfollows: Select the menu options "Parameters" => "Variable parameters" on theinitial confirmation screen. Take out the indicators "Open operations". The change is valid for the current plant and order type. |