Diagnosis The variable parameters are set in such a way that the system onlyselects operations which are not yet finally confirmed and whosecontrol key specifies that they require confirmation. Procedure To confirm operations that have been finally confirmed or that do notrequire confirmation, proceed as follows: Select the menu options "Parameters" or "Variable parameters" on theinitial confirmation screen. Take out the indicators "Open operations" or "Ops. req.conf." The change is valid for the current plant and order type. |