Diagnosis The component list in the MRO subcontracting external operation of thePM/CS order does not contain any components with the material provisionindicator (MPI) Rework Material to Subcontractor> (S).System Response You cannot save the PM/CS order. Procedure Maintain the components for the subcontracting operation or uncheck theSubcontracting> indicator for the relevant operation. |