Diagnosis You wish to create a release order against a contract. The contract item, which was created without a material number,contains the order unit>V2. in the release order, you have entered a material that has thebase unit of measure> &V1&. The base unit &V1& of the material cannot be converted into the orderunit &V2& of the contract item. The entry is therefore not allowed.Procedure Check the contract entered or maintain conversion factors in thematerial master record where necessary. Change material master> |