SAP Message /SAPPCE/PNV020 - Constr.progress report for WBS element &1 already exists for period &2/&3

Diagnosis
You want to create or change a construction progress report for aperiod although progress report already exists for a subsequent period(fiscal year &V1& and period &V2&).

Procedure

  • If the message is an error message you cannot create a construction
  • progress report for a period that lies before a period for which aconstruction progress report already exists.
    • If the message is an information or warning message, you can create or
    • change a construction progress report for a previous period.

      Procedure for System Administration
      You can control this message in Customizing for ConstructionProgress Report and Valuation under Change Message Control.