SAP Message /SAPCEM/PT249 - Operation &1/&2 cannot be processed here (see long text)

Diagnosis
Activity &V2& of network/order &V1& is not in the current internalworklist for capacity planning. This may have the following reasons:

  • the requirement was loaded into the planning board

  • the requiement does not belong to the current class &V3& (and/or work
  • center &V4&)

    Procedure
    To edit this requirement you have to enter via class &V3& (and/or workcenter &V4&) for which this requirement is generated.

    Procedure for System Administration

    Further notes
    The system generates the internal worklist for capacity planning onceduring selection of the planning board.