Diagnosis An equipment package can be assigned to a relocation/relocation steponly if the MPOs that belong to the main material/required materialsare also assigned to the relocation/relocation step. However, therequired MPO &1 is not assigned. System Response The equipment package cannot be assigned. Procedure First assign MPO &1 to the selected relocation step. |