Id | Title |
---|---|
WVLB116 | Build load: IB pur. reqs. &1 exist for plant &2 |
WVLB117 | Build load: promotion PO &1 exists for plant &2 |
WVLB118 | Build load: target (&1) > actual vendor service level (&2) for plant &3 |
WVLB119 | Load building cancelled as the required criteria are not met |
WVLB120 | Load building no longer necessary for the following purchase orders: |
WVLB121 | Load building using range of coverage algorithm not required |
WVLB122 | Order date for building load using range of coverage algorithm: &1 |
WVLB123 | Start of range of coverage algorithm |
WVLB124 | Load building cancelled due to problems with range of coverage algorithm |
WVLB125 | Execute range of coverage algorithm for day &1 and PO load &2 |
WVLB126 | Remove addition of quantity &1 for material &2 in plant &3 |
WVLB127 | Delivery date = start date of range of coverage algorithm: &1 |
WVLB128 | Load building cancelled: no listed material exists |
WVLB129 | Delivery date for POs with actual vendor service level from &1 to &2 |
WVLB130 | Delivery date fror POs for load building from &1 to &2 |
WVLB131 | Delivery date for promotion purchase orders in building load frm &1 to &2 |
WVLB132 | Release date for pur. reqs. in building load from &1 to &2 |
WVLB133 | Delivery date for pur. reqs in building load from &1 to &2 |
WVLB134 | Release date for IB pur. reqs in building load from &1 to &2 |
WVLB135 | Reason for termination of ROC algorithm: all restrictions are met |
WVLB136 | Reason for termination of ROC alg.: No additional qty in last step! |
WVLB137 | Reason for termination of ROC alg.:maximum range of coverage (&1) reached |
WVLB138 | Load building not necessary today |
WVLB139 | Material &1 cannot be ordered automatically for plant &2 |
WVLB140 | Current range of coverage in plant &1 for matl &2 (forecast: &4) &3 days |
WVLB141 | Range of coverage algorithm terminated after &1 day(s) |
WVLB142 | Current range of coverage date: &1 |
WVLB143 | Carry out more specific method |
WVLB144 | Additional quantity determined: &1 |
WVLB145 | Add quantity of &3 in PO &4 for plant &1 and material &2 |
WVLB146 | Add quantity of &3 in pur. req. &4 for plant &1 and material &2 |
WVLB147 | New rounded quantity (rounding value for new unrounded quantity): &1 |
WVLB148 | Released PO quantities (with delivery date <= &1) for range of coverage: |
WVLB149 | The following quantities will be included in load building: |
WVLB150 | Current stock of material &2 in plant &1: &3 (initial value for ROC) |
WVLB151 | Entries exist in list of results for &1 combinations |
WVLB152 | The following new quantities are produced for plant &1 and material &2 |
WVLB153 | New unrounded quantity (sum of all pur. req. and additional qties): &1 |
WVLB154 | New target range of coverage: &1 |
WVLB155 | Material not included as a result of shelf-life (maximum &1 days) |
WVLB156 | Vendor service level for plant &1, date &2: &3 (reason: missing forect) |
WVLB157 | Qty received (&1) or used (&2) leads to zero quantity |
WVLB158 | Program finished due to a serious error |
WVLB159 | Purchase order date = &1;delivery date = &2;act.vendor service level = &3 |
WVLB160 | Load building carried out (entry in result list) |
WVLB161 | No load building carried out (no entry in result list) |
WVLB162 | Processing time &1 with the following database access: |
WVLB163 | Reading: &1 materials; &2 PO items; &3 purchase requisition items |
WVLB164 | Writing: &1 PO items; &2 PR items; &3 result list items (WBO2) |
WVLB165 | Creation of purchase requisition for &1/&2 was terminated: &3 &4 |
WVLB166 | Vendor: &1 / Purch. org: &2 / VendSR: &3 / Plant: &4 |
WVLB167 | Automatic Load Building Carried Out Successfully |
WVLB168 | Load building completed: no relevant material available |
WVLBCHECK000 | Enter a valid combination |
WVLBCHECK001 | Enter at least one display option |
WVLBCHECK002 | No messages found for class &1 |
WVLBCHECK003 | Position cursor on message |
WVLBCHECK004 | It is not possible to branch to maintenance/display |
WVLBCHECK005 | Error calling user exit &1 in program &2 |
WVLBCHECK006 | Error calling user exit &1 in function module &2 |
WVLBCHECK007 | You cannot go to maintenance. For further information, see long text |
WVLBCHECK008 | You are not authorized to go to maintenance/display |
WVLBCHECK009 | You did not narrow down the materials selected |
WVLBCHECK010 | You did not narrow down the vendors selected |
WVLBCHECK011 | You did not narrow down the plants selected |
WVLBCHECK012 | No selection criteria entered for vendor sub-range |
WVLBCHECK026 | No interval exists for collective number |
WVLBCHECK027 | No interval exists for log |
WVLBCHECK028 | Number range for collective number does not exist |
WVLBCHECK029 | Number range and interval for collective number exists |
WVLBCHECK030 | Number range for log does not exist |
WVLBCHECK031 | Number range and interval for log exists |
WVLBCHECK032 | No parameters maintained for load building and investment buying |
WVLBCHECK033 | One parameter has been maintained for load building and investment buying |
WVLBCHECK034 | More than one parameters maintained for load building and investment buy |
WVLBCHECK035 | No restrictions maintained |
WVLBCHECK036 | Restriction &1 not maintained |
WVLBCHECK037 | All &1 restrictions maintained |
WVLBCHECK039 | All descriptions for &1 restrictions maintained |
WVLBCHECK040 | No description maintained for restriction &1 |
WVLBCHECK041 | No restriction categories maintained |
WVLBCHECK042 | Restriction category &1 not maintained |
WVLBCHECK043 | All &1 restriction categories maintained |
WVLBCHECK045 | All descriptions for &1 restriction categories maintained |
WVLBCHECK046 | Description for restriction category &1 not maintained |
WVLBCHECK047 | No restriction profile maintained |
WVLBCHECK048 | Restriction profiles maintained |
WVLBCHECK049 | A description has been maintained for every restriction profile |
WVLBCHECK050 | No description exists for restriction profile &1 |
WVLBCHECK051 | The item number of the purchase requisition is initial |
WVLBCHECK052 | No control parameters maintained for requirements planning |
WVLBCHECK053 | Control parameters maintained for requirements planning |
WVLBCHECK054 | The item number of the purchase requisition is not initial |
WVLBCHECK055 | No purchasing organization data found for the selected vendors |
WVLBCHECK057 | Several purchasing organizations maintained |
WVLBCHECK058 | Purchasing organization &1 maintained |
WVLBCHECK061 | No data exists for the selected plants |
WVLBCHECK062 | No factory calendar maintained for plant |
WVLBCHECK063 | Factory calendar &1 maintained for plant |
WVLBCHECK064 | No general data found for the materials selected |