Id | Title |
---|---|
WRF_APC217 | There are no assortments for the current selection |
WRF_APC218 | Material &1 cannot be used in assignments for purchasing list item &2 &3 |
WRF_APC219 | Key figure &1 cannot be used with purchasing list &2 |
WRF_APC220 | Assortment &1 cannot be used with purchasing list &2 |
WRF_APC221 | Key figure &1 cannot be used with assortment &2 |
WRF_APC222 | Another item with same presentation date already exists for material &1 |
WRF_APC223 | No assignment data found for purchasing list item &1 |
WRF_APC224 | Enter basic data to create the new planned material |
WRF_APC225 | Characteristic &1 could not be deleted |
WRF_APC226 | Characteristic &1 could not be deleted |
WRF_APC227 | No reference plants found |
WRF_APC228 | No reference store found. Scheduling not possible |
WRF_APC229 | No reference distribution center found. Scheduling not possible |
WRF_APC230 | Perform a scheduling first before you change the calculated dates |
WRF_APC231 | Unable to read dates from previous scheduling, invalid dateline |
WRF_APC232 | Expand not possible, material &1 has no characteristic &2 |
WRF_APC233 | Assign characteristic values to purchasing list item &1 &3 |
WRF_APC234 | You cannot copy assortment &1 to itself for the same key figure |
WRF_APC235 | You do not have authorization for this transaction |
WRF_APC236 | External purchasing list ID must include characters and numbers |
WRF_APC237 | Planning not allowed for hierarchy &1, node &2 (hierarchy level) |
WRF_APC238 | Planned quantity mismatch for key fig. &1 and assort. &2 at level &3 |
WRF_APC239 | Invalid purchasing list number &1: it contains only numbers |
WRF_APC240 | Invalid header data; purchasing list could not be created |
WRF_APC241 | Purchasing list reference &1 already exists |
WRF_APC242 | No valid assortments assigned to the relevant nodes of hierarchy &1 |
WRF_APC243 | Purchasing list item &1 &2 is locked by user &3 |
WRF_APC244 | No ref. material found for material group &1; scheduling not possible |
WRF_APC245 | Purchasing list &1 does not exist |
WRF_APC246 | An application log has been generated for purchasing list &1 |
WRF_APC247 | No purchasing list could be selected |
WRF_APC248 | You can only create purchasing list items for single or generic materials |
WRF_APC249 | Assortment type &1 does not exist |
WRF_APC250 | Purchasing list &1 already exists; choose a different number |
WRF_APC251 | Enter a vendor (tab Purchase/Sales) before creating a dateline |
WRF_APC252 | Scheduling not possible, enter missing purch. organization in header data |
WRF_APC253 | Error during scheduling |
WRF_APC254 | Material &1 is assigned to a different season than this purchasing list |
WRF_APC255 | Material &1 does not belong to hierarchy &2 |
WRF_APC256 | Material &1 does not belong to node &3 &2 or any subordinate nodes |
WRF_APC257 | Presentation date &1 is outside the validity period of the rollout |
WRF_APC258 | Selected assortments cannot be used for hierarchy &1 / node &2 |
WRF_APC259 | Dateline not yet created; display not possible |
WRF_APC260 | Cannot undo the release of purchasing list item &1 &2 |
WRF_APC261 | Changes to purchasing list item &1 &2 are not allowed |
WRF_APC262 | Purchasing list &1 with different header data has been selected |
WRF_APC263 | Enter a presentation date before creating a dateline |
WRF_APC264 | No stores found for assortement &1 and distribution center &2 |
WRF_APC265 | No distribution center found for assortment &1 |
WRF_APC266 | No plant found for assortment &1 |
WRF_APC267 | &1 is not contained in data dictionary as name of a structure |
WRF_APC268 | Structure &1 is not active |
WRF_APC269 | Field catalog does not match structure &1 |
WRF_APC270 | Purchasing list &1 is not assigned to any sales or/and purchasing org. |
WRF_APC271 | Quantity mismatch for key figure &1 and assortment &2 at level &3 |
WRF_APC272 | Quantity mismatch for key figure &1 and assortment &2 |
WRF_APC273 | No DCs assigned to the stores - assortments - hierarchy &1 node &2 |
WRF_APC274 | No difference between planned and assigned quantities |
WRF_APC275 | No incoterms found for material &1 vendor &2 sales organisation &3 |
WRF_APC276 | This function is only available for items referring to a generic material |
WRF_APC277 | No valid rollout for presentation date &1 |
WRF_APC278 | Season &1 &2 &3 has expired, choose a valid one |
WRF_APC279 | Purchasing list item &1 &4 cannot be transferred to purchasing list &2 |
WRF_APC280 | Selected purchasing list item can no longer be changed |
WRF_APC281 | Choose PRICAT processing status: 01 (open) or 04 (forwarded) |
WRF_APC282 | Target purchasing list &1 same as the current one; cannot transfer |
WRF_APC283 | Duplicate entries for material &1, change presentation date &2 |
WRF_APC284 | Target PL &1 belongs to diff. hierarchy: &2, node &3; cannot transfer |
WRF_APC285 | Planned quantities exceed target quantities for assortment &2, &1 |
WRF_APC286 | Planned quantities fall below target quantities for assortment &2, &1 |
WRF_APC287 | Rollout is initial |
WRF_APC288 | No PRICAT material found |
WRF_APC289 | Internal error updating purchase order quantities |
WRF_APC290 | Material &1 already exists for catalog &2 and EAN/UPC code &3 |
WRF_APC291 | Planned material &1 already exists for catalog &2 and EAN/UPC code &3 |
WRF_APC292 | No scheduling available for selected purchasing list item |
WRF_APC293 | Variant &1 already exists for catalog &2 and EAN/UPC code &3 |
WRF_APC294 | The assignment is locked. No changes allowed. |
WRF_APC295 | Materials &1 and &2 do not have the same material category |
WRF_APC296 | Assignment for &1, key figure &2 and material &3 has not been copied |
WRF_APC297 | Enter a presentation date for purchasing list item &1 &2 |
WRF_APC298 | There are no planned quantities for item &1 &2 |
WRF_APC299 | Repeat scheduling for transferred item &1 &2 in purchasing list &3 |
WRF_APC300 | Neither vendor nor local currency found, cannot price material &1 |
WRF_APC301 | Vendor currency unknown, price for material &1 is in local currency |
WRF_APC302 | Cannot make changes to material &1 |
WRF_APC303 | Local currency not found |
WRF_APC304 | Item table of PRICAT is empty; blocking is not possible |
WRF_APC305 | Variant &1 has no link to generic material; it cannot be loaded into PL |
WRF_APC306 | Distributed putaway qty for item &1 &2 exceeds allowed qty in PL &3 |
WRF_APC307 | New target purchasing list for season &1 &2 &3 could not be created |
WRF_APC308 | No header data found for catalog &1 |
WRF_APC309 | No Vendor found for catalog &1 |
WRF_APC310 | EAN &1 already exists for material &2 |
WRF_APC311 | Calculating quantities bottom up only makes sense for generic materials |
WRF_APC312 | Variant-creating characteristic &1 does not exist for EAN &2 |
WRF_APC313 | Vendor price for EAN &1 does not exist |
WRF_APC314 | Vendor currency for EAN &1 does not exist |
WRF_APC315 | No classification was found |
WRF_APC316 | You are not authorized to process data for purchasing group &1 |