Id | Title |
---|---|
WG341 | None of the vendors selected participates in Order Optimizing |
WG342 | Automatic order creation not allowed. See table &1 for &2 &3 |
WG343 | Please position cursor in a header line |
WG344 | No variants for selection exist |
WG345 | System error creating purchase orders. Data reset. |
WG346 | Load build by order date &1 . Vendor &2, plant &3, VSR no. &4 |
WG347 | Error converting to base units of measure. Material & |
WG348 | Quantity was rounded down to zero. Material &1, plant &2, pur.org. &3 |
WG349 | General Customizing setting missing for auto. load building |
WG350 | Purchase order created with number &1 |
WG351 | Expiration date &3 exceeded. No additional qty for material &1, plant &2 |
WG352 | Material &1, plant &2. Additional qty &3 &4. |
WG353 | Max.coverage is &3 days for material &1, plant &2, iteration &4 days |
WG354 | Max. period of coverage of &3 days reached for material &1, plant &2. |
WG355 | Vendor service level &3 % for vendor &1, plant &2 greater than &4 % |
WG356 | No listed items found for vendor &1, plant &2, VSR &3 |
WG357 | No listed materials found for vendor &1, plant &2, VSR &3 |
WG358 | Error occurred when accessing log table for load building lines (WBO2) |
WG359 | Price falls on &4 for vendor &1, plant &2, material &3 |
WG360 | Info record &1, current price &2, future price &3 &4 |
WG361 | Vendor service level &3 % for vendor &1, plant &2 <= &4 % |
WG362 | No data entered in results list. Vendor &1, plant &2, VSR &3 |
WG363 | Result of last iteration rejected. Target restriction exceeded |
WG364 | Adding individual materials to meet multiple restriction |
WG365 | Nothing for ordering, or purchase order has already been created |
WG366 | Position the cursor correctly |
WG367 | Use the new load building transaction WLB13 only. |
WG368 | Purchase order &1 is blocked by user &2 |
WG369 | You are not authorized to use transaction &1 |
WG370 | Select 2 rows exactly |
WG371 | Select at least one row |
WG400 | Invalid input parameter (&1 = &2) calling FM: &3! |
WG401 | Not all information exists that is required for order splitting |
WG402 | Errors withour detailed information on calling FM: &1 occurred |
WG403 | No order item (EKPO) for PO &1 found |
WG404 | No delivery schedule (EKET) found for PO &1 |
WG405 | No PO header (EKKO) found for PO &1 |
WG406 | Error calling user exit &1 in FM: &2 |
WG407 | Splitting PO &1 using user exit &2 not possible! |
WG408 | A minimum restriction is not met. Splitting not possible. |
WG409 | Split not possible based on restrictions entered. |
WG410 | Restriction category & not valid. |
WG411 | Split not possible, as only one item exists |
WG412 | Error in FM: &1, not all order items created. |
WG413 | Error in FM: &1, two documents generated for a new PO |
WG414 | Error in FM: &1, error calculating restriction values |
WG415 | Split not possible. Multiple restriction would not be met |
WG416 | Do not split collective purchase orders and allocation table POs |
WG449 | PO &1 rejected: multiple use |
WG450 | PO &1 rejected: different plants |
WG451 | PO &1 rejected: different vendor sub-ranges |
WG452 | PO &1 rejected: plant not in selection range |
WG453 | PO &1 rejected: Material not in selection range |
WG454 | PO &1 rejected: material group not in selection range |
WG455 | PO &1 rejected: vendor material no. not in selection range |
WG456 | PO &1 rejected: vendor sub-range not in selection range |
WG457 | PO &1 rejected: delivery date is in past |
WG458 | PO &1 rejected: delivery date too far in future |
WG459 | Only select lines that belong to the same vendor |
WG470 | Delivery date occurs in the past |
WG471 | Purchase order date must fall between delivery date and todays date |
WG472 | Purchase order &1 will not be changed as it has already been released |
WG473 | System error during creation of purchase requisitions. Data was reset |
WG899 | STEPLOG: & "&" & & |
WGRC000 | Invalid entry; enter just one CHANGING parameter |
WGRC001 | Invalid Entry |
WGRC002 | No resources maintained for chosen gate/zone |
WGRC003 | No/Insufficient capacity available in this period |
WGRC004 | Not sufficient capacity available |
WGRC005 | Error while calling popup |
WGRC006 | Material &1 does not exist |
WGRC007 | Error while calculating occupied time window |
WGRC008 | Enter either the door or the staging area |
WGRC009 | No changes were made |
WGRC010 | Make an entry in field &1 |
WGRC011 | Data saved successfully |
WGRC012 | Vendor &1 cannot be found |
WGRC013 | Plant &1 does not exist |
WGRC014 | Vendor Subrange does not Exist |
WGRC015 | No assignment exists for &1, plant &2, storage location &3, subrange &4 |
WGRC016 | Cannot display document &1 |
WGRC017 | Error while reading Customizing |
WGRC018 | Customizing is not maintained for goods receipt capacity check |
WGRC019 | No general entry maintained; create week 0 |
WGRC020 | Reading assignments failed |
WGRC021 | Plant &1 does not exist with storage location &2 |
WGRC022 | Cannot determine warehouse number for plant &1/storage location &2 |
WGRC023 | Field act_id from data record with key &1 is initial |
WGRC024 | Invalid time '24:00:00' |
WGRC025 | No inactive vendors found |
WGRC026 | End date must be after start date |
WGRC028 | Start date cannot be in the past |
WGRC030 | No special weeks exist |
WGRC031 | Door &1 does not exist |
WGRC032 | Staging area &1 does not exist |
WGRC033 | Invalid date entered: &1 |
WGRC034 | Vendor &1 is already intended for &2 &3 |
WGRC035 | No factory calendar maintained for plant &1 |
WGRC036 | Save data before copying |
WGRC037 | Orders exist for week &1 |