Transaction SAP ME59 - Génération automatique commande

Notes associées
445222MM-SRV: Indicator EKPO-WEBRE for services
339057Redesign quantty conversion:ME59 ignores order unit
113182ME59:No conversion to order unit
382383Incor.commts update through aut.PO genratn fm PREQs
332509ME59 incorrect delivery date as of second PO item
307848Production version in automatic PO creation fr.PReq
427854ME59: No field selection for auto. converted purchase orders
817589ME59: Wrong net price when Requisition item has a batch
43179Wrong doc. flow from purchase order to sales order
111526ME59: error from second assigned PReq
208096ME21 no quantity rounding for PREQ reference
373361ME21: Requisitioner (EKPO-AFNAM) does not exist
336552Performance ME21, ME22, ME59
531182ME59 Third-party requisitions are converted several times
368945Performance of ME21, ME22, ME51, ME52
322012ARun - short dump
600611ME59 Problems during the transfer of delivery addresses
401817Incorrect reduction of capacity and performance
385681Performance of Capacity
331020Create PO with PReq reference for NO GRID materials
627846AFS: Purchase order document flow for sales order incorrect
336167Performance J_3A_PO_RESH_UPDATE Note 0308879
311765Termination ME59 for large dataset
172468ME21 Sales order BOM not exploded
47815Subcontracting: Explosion of configured BOM
163100AFS Conversion PR to PO update termination
642448RM06BZ10: source of supply assigned incorrectly
153113ME27 availability check via APO: Message 06450
114213ME59: Determining the order document type
1444184ME21 does not set a lock on purchase requisition
583333ME59 overconfirmation with stock transport requisitions
127705Conversion of SC requisition w/o BOM: Error message ME 154
371292Incorrect item quantity after conversion of SC PReq
149971AFS When PReq converted into PO planned vendor lost
376931ME59: CS data not transferred to purchase order
335079ME59/ME59N: "Automatic purchase order" ind. in vendor master
424517Default value: Time of delivery in online planning
510269Tax code determination for service item
519063ME59: Purchase orders with reference to SD documents
594911ME59 Incorrect Delivery Address in purchase order items
145272MRP:Stk transfer w/ plant = vendor f. sched. agrmnt
486856ME59: Purchase orders with expiring currency
491211FAQ: Purchase order (general)
440467Data inconsistency in case of error in sales order update
372859ME21N: Posting a purchase order after commitments error
194169Requirements fr.SC Preq open again after conversion
459350FAQ: Partner determination in purchasing
97011Subcontracting: Explosion of configured BOM
492935ME21N ME22N FICORE704 upon company code change
74994Materials planning: Stock transfer to plant =vendor
352979Collective note: Performance notes for IS-AFS-MM
451143Tracking number for 2-step transfer not generated in batch
339008 EURO conversion: Expiring currencies in purchasing
635511FAQ: Purchase requisitions in the service
625892ME59 ME59N Problem during background processing
401437Quantity optimization: PReq and contract in user exits
37170Partner is ignored
192529MRP: Stock transfer with plant = vendor
786303Analysis report RM06ME59 PReq check
667114AFS: Rounding for a schedule line
356502Error message V1198 if creating PO for SD doc PReq
458384FAQ: Consulting for the changeover to the euro in purchasing
495316Taxes with services
668764FAQ: Source list in purchasing
456691FAQ: Price determination in purchasing
188837Purchase order generation performance
600883ME21N Availability check with product allocation in the APO
885177Stock transfer in purchasing: New schedule line processing
458606FAQ: Subcontracting in purchasing