Transaction SAP MD12 - Modifier ordre planifié

Notes associées
158881AFS: no BOM expl. in plnd ord for NOGRID material
160506AFS: Plnd ord qty = ? when returning from 'AFS size
158628AFS: Plnd ord qty = ? when returning from 'AFS size
155525AFS: Plnd ord qty = ? when returning from 'AFS size grid'
641489R/3->APO: Unchanged planned orders sent to APO (BAPI)
605282MD11/MD12: Components' requirement dates
85583MD12: Deleting planned order
149363Genratng plannd ordr w/o AFS grid info/plannd order
743575R/3->APO: Unchanged planned orders sent to APO
126723ECR: Too many components in planned order
338715Order with zero duration: basic dates incorrect
442419Underconfirmation for conversion of pl. ord. -> prod. order
397515MF50: Message 61064 during planned order creation
350452Unexpected display of Marker button in Planned order
169827ATP: Insertion of simulated requirement incorrect
529275Plnd order:ATPSERVER not current in case of reqmts diversion
329948SAPLCXOT: "PARAMETERS_NOT_VALID"
96107Order: scheduling with 'Adjust basic dates'
166296Planned ord: Ref. op. set referenced sev. times
82096MD13,MD12: Display configuration, revision level
818657Planned order with alternative production plant not shown
421497Rounding problems when splitting requirements
157996Incor.qty distr.of compnents in plnd order procssng
360886Sub-operation deallocated after scheduling
130889Requirmnt qty 0 for components in AFS planned order
34750Dispatch/deallocate operation: Change order quantity
158595Assembly: incorrect delivery proposal
376908 Planned order has component with quantity Zero
171968Incorrect requirements dates in planned order
312087Planning check for planned and production order
80200Display of availability dates in planned order
449429Sub-operation: KBED-VORNR does not contain operation number
516684Rounding problems when splitting requirements (2)
166358Missing data for subcontracting components
158732Missing compnts in prod.order f.conv.from plnd ordr
447451Basic finish date is moved in planned order
130864Reqments date components in scheduled planned ord
184898Missing component assignment in the planned order
99631Quantity adjustment for alternative BOM items
146132Planned order: Error when component display called
85640Planned order: Characteristic grouping
351178Incor statistics drng update sales order fr plannd o.
647279Planned order: Unit of measure with availability check
129661Dep.requirements date/scheduling planned order 1.0D
443446Planned order/SC procurement proposals: Availability check
86369MD11,MD12: directly produced compnts in plnd order
69001Planned order: requirements date of mat. components
165940MF70: Planned order quantities are incorrect
380389ONR00 entries for object types O1, O2 without KBED
128122Scheduling of planned order: Changing work center
632951Basic date in planned order incorrectly adjusted
141939AFS: Comp.in Prod.order w/o category after conv.from chgd.Pl
386279Lead time/lead-time offset in planned order
328045'AFS adopt grid qties' button without function
350271Incorrect conversion between order units
632598MF70:Incorrect GR qties, short dump TABLE_INVALID_INDEX
362265Requirmts dates in pland order w/phantom assemblies
129707Reqmnts date components in scheduled planned order
183083J_3AMRP4: "Fixed" indicator/production order
209109Basic dates are on non-working day after adjustment
377792Scheduling planned order for recipe incorrect
39032No BOM explosion with production version
207998MRP: Scheduling in the planned order
332255Dump for planned order scheduling with phantom
52784MF40: component quant. + MF43: secondary require.
520081ONR00 entries for object types O1, O2 without KBED
192714Scheduling via capacity versions
764611FAQ: Static assembly
164722AFS Check report for receipts/requ. without date
517373Move time from matrix scheduled incorrectly
416932Confirmation planned order: No reading of component assignme
162845AFS Check report for subcontracting planned orders
582320MD11/MD12:Error during basic date determin. in planned order
324542CM21: Error when dispatching AFS planned orders
386345Lead time taken into account twice in the planned order
625196Planned order: Rounding of co-products / by-products
309081Requirmts dates in plnd order w/ phantom assemblies
781632Constant new explosion in SAP APO after changes in SAP R/3
436360MD12 scheduling Planned Order incorrect dates in J_5CL
190002MRP, planned order,... incorrect BOM explosion
356120Planned order:refnce.operation set referenced several times
536617Order dates of planned order incorrect for night shifts
781749R/3-APO: Method for the planned order integration
651537R/3-APO: R/3 re-explosion does not cause re-explosion in APO
90381Date shift by one day in the order
611153APO<->R/3: Planned order dates check (modification)
103717Quantity adjustment after manual component change
46155Subcontr.and phant.assemb.:SK-BED not LB-BED UK&NOTE_SYMPTOM
303485Runtime problems during ATP check
194019Basic dates, production start are incorrect
318616Plnd ordr:Ordr start date later thn ordr finish dte
184543Scheduling planned order: Incorrect component dates
90663Capacity reqs planning: Unit unknown; distribution
204409Incorrect requirements dates during dispatching
340018Error using 'Adjust Quantities' w/o maintaining Bundles
602625MF50:order finish date for night shifts
160736Configuration for result-oriented order BOM
122019Error in date proposals during component check
411618MRP explodes material BOM instead of WBS BOM