512790 | Performance problems when processing many orders |
52038 | MD01: Resched.check when ord.finish = per.end |
1119048 | Scheduling agreement item not proposed for settling |
150581 | 4.6A Characteristics planning with <, <=, >, >= |
425143 | Interactive planning: Incorrect/missing components |
319434 | Dump when scheduling several planned orders |
686785 | Incorrect or negative quantity in field EKPO-MENGE |
206399 | MRP: Material shortage in MD04 after planning |
113115 | Components are lost during manual rescheduling |
133438 | Characteristics planning NOT w/ usage of user exit |
126723 | ECR: Too many components in planned order |
580414 | EBP: PReqs generated by MRP are not transferred |
132890 | Charctristics planning: supportng points not stored |
31156 | Selection of alternative bills of material |
324120 | Dump in planning run: owner MARA ... does not exist |
77408 | Discontinued parts and safety stock |
808291 | VL10D: delivery quantity too high |
865621 | AFS MRP (/AFS/MD02) halts with exception message no. 61060 |
49778 | COMPUTE_FLOAT_ZERODIVIDE in SAPLM61U |
529275 | Plnd order:ATPSERVER not current in case of reqmts diversion |
426422 | CALL_FUNCTION_CONFLICT_TYPE during takt-based scheduling |
314100 | Periodic lot size: delivery date not at beginning of period |
73558 | Dispatch planned order: Incorrect component dates |
331923 | MD04: Returns delivery is not displayed |
143487 | BOM explosion in planned order |
625857 | 351451: Work breakdown structure BOM is not transferred |
154161 | BOM explosion in planned order III |
148029 | BOM explostion in planned order II |
789711 | MD03: Unanticipated message M8 815 in requirements planning |
81377 | Source determination for CC delivery |
359288 | Incor.available qntity for scheduled planned orders |
400155 | Period lot size: delivery date not on start of period II |
77577 | Performance mat.req.s planning, production versions |
73467 | Discontinued parts with distribution key |
132494 | Forecast:incorrect period with fiscal year variant |
410754 | Delivery schedules generated manually not changeable |
351738 | Error in Note 189826: Rough-cut scheduling |
78244 | Planned order: Change in single-item planning |
205121 | MD01: Incorrect dates during date specification = 3 |
40847 | Scheduling for schedule lines |
160004 | AFS Copying of secondary requirement |
120546 | MRP: Procurement proposal in the past |
797366 | MD03: Message ME 814 with stock transfer items |
421465 | Corr. Note 409130: New delivery schedules cannot be changed |
447451 | Basic finish date is moved in planned order |
51715 | Planned order: Reset buffer tables |
107942 | MD03 ME38 delivery schedule without components |
328907 | MRP controller as creator of PReqs from MRP run |
501895 | Returns purchse order not taken into account for MRP type V1 |
53090 | Planning performance, stock transport orders (3.0C) |
71482 | Discontinued parts and make-to-order production |
371016 | MRP: Material is not planned for MD01 / MDBT |
362704 | Inappropriate JA text for MRP element data |
416199 | Planning mode 1: no scheduling of firmed planned orders |
51706 | BOMs: Low-level code 999 for co-products |
132623 | Discntnuatn after consumption:missng rqmts divrsion |
188225 | MD01: Planning file entry not reset |
65737 | MRP run: Error message 06 859 without further info |
369732 | MD04 Missng stck transport schedlng agrmnts in issuing plant |
747349 | Problms through EKPO-MENGE is <> than total of EKET-MENGE(2) |
632951 | Basic date in planned order incorrectly adjusted |
174198 | Man.rescheduling of subcontractor delivery schedule |
547465 | R/3->APO: COM error 079 after planning run in R/3 |
165852 | Period total:SAFT consumed twice (MF50, MD04) |
78091 | Planning mode 1 and change issue storage location |
73780 | Production order has no effect on availability |
301681 | Doc: MRP takes no customer consignment stock into account |
614485 | Takt scheduling incorrect in case of several sales orders |
664084 | Sel. f. several valid scheduling agreements in source list |
199757 | MD04 Reservation loses ref. to sales order |
362265 | Requirmts dates in pland order w/phantom assemblies |
67589 | MD:Assigned shipping notification in wrong segment |
81469 | MRP, long-term planning |
141803 | Subcontractor requiremnts in wrong planning segment |
39032 | No BOM explosion with production version |
369032 | Error TD607 in PFS upload / performance MRP |
207998 | MRP: Scheduling in the planned order |
332255 | Dump for planned order scheduling with phantom |
42511 | BOM: Error in low-level code assignment |
171363 | MRP type V1/V2 and stock transfer reservations |
84823 | Pland.orders in plnng time fence for prd lot size |
172208 | MD01: Plant = vendor, no planning file entry |
425314 | MRP and fiscal year variant: Incorrect dates and quantities |
76747 | MRP: EM 61060 'The date 00/00/0000 not convertible' |
204802 | KKS2, CO88, production order: Error KV216 |
409130 | Planning: Subcontr.deliv.sched. w/ partl delivery changeable |
413887 | Incorrect configuration when changing a schedule line date |
960410 | Forecast value in current period with decimal places |
145272 | MRP:Stk transfer w/ plant = vendor f. sched. agrmnt |
84186 | Planning file entries and external requirements |
186608 | Periodic lot size: Order proposal too late |
386345 | Lead time taken into account twice in the planned order |
625196 | Planned order: Rounding of co-products / by-products |
842976 | Component in planned order although not production-relevant |
430184 | Maintenance order: missing rescheduling check |
211628 | MRP: Stock transfer with vendor = plant |
140661 | Rescheduling of capacity-firmed planned orders |
89701 | Component allocation lost (planning mode 1 or 2) |