526227 | MD01: In MRP-total planning short dump occurs |
576460 | Plan Order doesnot exist but displayed in MRP after MD01 |
332918 | MD04/MD05: Display/change PReq |
135119 | Stock/requirements list : pick up on reservations |
163567 | Insufficient performance |
567243 | Plan Order doesnot exists in the system but display by MRP |
699079 | AFS MRP creates stock proposals without grid values |
512790 | Performance problems when processing many orders |
142537 | Parallel processing for AFS MRP according to SAP standard |
49074 | MD01: Performance: Log is initialized |
52038 | MD01: Resched.check when ord.finish = per.end |
928831 | MD06 : Plant stock shows incorrect value for CS materials |
150581 | 4.6A Characteristics planning with <, <=, >, >= |
49429 | Performance: No routing check |
109341 | MD04: Branch to SD quotation --> Change |
72885 | 3.1H Variant configuration - Storage release |
196861 | Material status MM/PP is ignored in total planning |
319434 | Dump when scheduling several planned orders |
191949 | ECH: Performance improvement |
133438 | Characteristics planning NOT w/ usage of user exit |
126723 | ECR: Too many components in planned order |
339431 | No MRP outside SKU horizon if SKU indicator set |
580414 | EBP: PReqs generated by MRP are not transferred |
34595 | Performance: TIME_OUT during scheduling |
541478 | Different delivery date in PReq on material/ schedule line |
168712 | Check/Correction Report:AFS_Dependent Requirements |
208852 | No BOM explosion in spite of planning mode '2' |
31156 | Selection of alternative bills of material |
206919 | Deadlocks on table J_3AMRPR |
77408 | Discontinued parts and safety stock |
808291 | VL10D: delivery quantity too high |
865621 | AFS MRP (/AFS/MD02) halts with exception message no. 61060 |
176540 | AFS MRP total planning batch run |
167766 | Periodic lot sizes: Start date determination |
49778 | COMPUTE_FLOAT_ZERODIVIDE in SAPLM61U |
426422 | CALL_FUNCTION_CONFLICT_TYPE during takt-based scheduling |
314813 | MRP run with scope of planning loops |
314100 | Periodic lot size: delivery date not at beginning of period |
550093 | Different data in PReq on material/schedule line view |
363620 | MM/PP creates incorrect termin.message in MD01/MDBT |
809640 | MD01: UM815 w/ parallel execution of mat requiremts planning |
332722 | MD01: Total planning parallel proc. for CS material |
143487 | BOM explosion in planned order |
154161 | BOM explosion in planned order III |
148029 | BOM explostion in planned order II |
81377 | Source determination for CC delivery |
359288 | Incor.available qntity for scheduled planned orders |
519506 | BOM explosion: Short dump when using functions |
400155 | Period lot size: delivery date not on start of period II |
77577 | Performance mat.req.s planning, production versions |
73467 | Discontinued parts with distribution key |
184171 | MRP planning run with configurable materials |
132494 | Forecast:incorrect period with fiscal year variant |
351738 | Error in Note 189826: Rough-cut scheduling |
156582 | Parallel planning w/ user exit: statistics display |
382541 | ECH: Performance improvement of effectivity during MRP run |
207197 | Additional info for Note 186608 |
205121 | MD01: Incorrect dates during date specification = 3 |
40847 | Scheduling for schedule lines |
378176 | MDVM is not changed for change material for AFS |
48281 | Performance for material quantity calculation |
529206 | Headr quantty and schedle line quantity in PReq not the same |
120546 | MRP: Procurement proposal in the past |
395069 | Parallel planning with scope of planning loops - II |
447451 | Basic finish date is moved in planned order |
380807 | Incorrect components in collection proposals |
51715 | Planned order: Reset buffer tables |
107942 | MD03 ME38 delivery schedule without components |
501895 | Returns purchse order not taken into account for MRP type V1 |
34265 | MRP: Intervals of available capacity are not observed |
53090 | Planning performance, stock transport orders (3.0C) |
50905 | 3.0D,3.0E IMPORTANT: Planning run performance |
504976 | Subcontracting PO coverted from a PR has incorrect quantity. |
71482 | Discontinued parts and make-to-order production |
178126 | Update component status in MRP run |
783822 | AFS Online MRP: Deadlocks between table MDKP and MDVM |
66379 | 3.1G: Incorrect relationships in MRP, performance |
371016 | MRP: Material is not planned for MD01 / MDBT |
549823 | MRP creates purchase requisitions without grid values |
155335 | Parallel planning: User exit does not stop |
504153 | SAPSQL_ARRAY_INSERT_DUPREC (J_3ABSSI) |
416199 | Planning mode 1: no scheduling of firmed planned orders |
181014 | Enhancing rprt J_3AMRP4 by correctn of pland odrs |
51706 | BOMs: Low-level code 999 for co-products |
132623 | Discntnuatn after consumption:missng rqmts divrsion |
188225 | MD01: Planning file entry not reset |
65737 | MRP run: Error message 06 859 without further info |
184851 | Initialization of AFS MRP run |
632951 | Basic date in planned order incorrectly adjusted |
547465 | R/3->APO: COM error 079 after planning run in R/3 |
78091 | Planning mode 1 and change issue storage location |
371915 | Incor. BOM explosn after change of bill of material |
73780 | Production order has no effect on availability |
301681 | Doc: MRP takes no customer consignment stock into account |