183375 | Process meter read. orders of tech. installed devices |
149961 | Overestimation factor with estimation of MR results |
186651 | Met. read. dataproc.: multpl trig. of ident. events |
204160 | EL27: Different upper and lower limits |
163360 | Validation 96 - Fixed value deviation |
306267 | Independent validation: Fixed value deviation |
206771 | Convert meter readings to consumption w. gas meters |
164432 | No validation class found for meter reading entry |
166097 | Extrapolation when creating rereading order |
158676 | Extrapolation from period of previous year |
1180536 | Active estimatn for resetting register during MR at move-in |
311677 | EL27: Consumption not adjusted when MR changed |
165881 | Overview information for validation |
199117 | Met.read data processing: device 'choose' incorrect |
1574662 | Expected meter reading in overview of validations |
335999 | EL28: EL401 future meter reading lower |
201982 | Enter MR results: No consideration of future MRs |
214924 | EL28:Assessing prformd w.real prev.mtr readng rsult |
156949 | Changing MR results with floating backbilling |
188309 | MR entry: Tolerance limit valid. for sev. periods |
309840 | EL27 - EL29: EL401 also with balancing registers |
168249 | EL27: No SM order with control reading order |
188210 | Meter reading estimation: meter reader is deleted |
165677 | Wrong error class for tolerance limit validations |
309800 | EL29: Moving back the meter reading date |
154396 | Billing term.: Several MRs with same date and time |
209915 | Billed meter reading result can be changed |
174039 | Deregulation change of contract: Fixed MR date |
145527 | Meter reading entry: Consumption determination |
188364 | Processing MR documents of uninstalled devices |
188855 | Meter reading data: List of information on validation |
157018 | EL29: Change meter reading date |
683674 | EL27: DBIF_RSQL_INVALID_RSQL Select all portions |
208439 | EABL: Enhancement of customer-specific data |