Transaction SAP CO09 - Synthèse des disponibilités

Notes associées
730456VL10: checking rule incorrect when branching to CO09/CO06
91151 CO09, CO06:incorr.goods recpt time for purch.order
766475FAQ: ATP check and confirmation of stock transport orders
153452ATP: Stocks with split valuation
140011ATP: Incorrect processing of consignment stocks
171799ATP: avail.overview: Order reservation w/o info
123500Controlling the results of the availability check
69088CO06, CO09 del.schedules with incorrect quantities
65019Dependent reqs and subcontracting CO06, CO09
45941Availability check, split valuation CO06 CO09
610637VL10: error CO774 while branching to unrestricted stock
169827ATP: Insertion of simulated requirement incorrect
47445Confirmed quantity of reservations not displayed
337297VL10:branching to stock balance disply not possible
421909Selection of reservations: Differences in MB25/MD04
97218Dupplic. purchase requisit. with split valuation
600776VL10: Storage location incorrect when branching to MMBE
449268VL10: Display 'Unrestricted-use stock' for deliveries
1332367No error message issued while saving Return Purchase order
123541Subcontractor requirements as inward movements
80200Display of availability dates in planned order
318998Cumulatd ATP on higher-level > than on subord.level
327974No import of material master for APO materials
128545CO09, CO06: Empty lines in the display
929718Requirements for deliveries are not correctly updated
357682EBP: Availability check does not work
182516Incor. procmnt. indic. f. material w. special proc.
66117Dependent requirements and subcontracting
89090Duplic. purch.orders, w. batch, w/o storage locat.
722860Missing parts for directly produced component
201613ATP Over-confirmation in batch determination
61588Availability check - split valuation, batch
82878Deletion of a referenced sales order
147325ATP: Purchase requisitions from outline agreements
89362 No confirmation despite available quantity/stock
187961ATP: Procurement type is not assigned a new key
430105No available qty for batch determination in confirmation
689014Incorrect receipt date of stock transfer order
1163788ATP Overview displayed qty incorrect for partially del. STO
481277Incorr. available qty of individual batches in batch determ.
43456Availability check together with QM
62126Availability check + reqs f. stock trans. delivery
606282FAQ: Returns processing, requirements and ATP
153355No availability owing to negative ATP quantity
426648Missing part mail checklist for goods movements
392292Double requirement for rush order
182449Modif:Cllctive availblty chck aftr bckrder prcessng
521704VL10: Jump from the list in transactions for example VL02N
597233ATP Server: Co-products are taken into account twice
52500Collective note: Availability and requirements 3.0E
682613FAQ: Local ATP from CRM
360859Correctn report: Missing material availability date
547118FAQ: Result of ATP calculation
450674Processing the date and time in the time series
634038MRP: Returns order and delivery
907053Analysis report for missing reqmts due to initial SUMBD
323991Availability check:Subcontract PReq subcontract PO componnts
493381Displaying maximum ATP quantity on missing parts list
498149FAQ: Availability check in purchasing
885177Stock transfer in purchasing: New schedule line processing
520765FAQ: Reporting IM (no LIS)
547512FAQ: Customizing of the ATP in R/3