| 678149 | Error /CAB/PP_CO 880 while copying coll. ord. |
| 800357 | Missing Individual length screen for component in CO02/CO01 |
| 353595 | No access to configuration in MD82 after COCM2 |
| 188806 | Assembly:Availability check returns incorrect dates |
| 66510 | Create order: locking the order header |
| 624684 | Drum Calculation in Collective Order |
| 655072 | CO01 - Inconsistency between J_5CO and J_5CL |
| 65072 | BOM expl.: incor. original qty f. us. prob. '2' |
| 838515 | CO02: You cannot return to variant transaction |
| 406153 | Component issuing storage location determination not correct |
| 113578 | Availibility check in production order |
| 306639 | Incor.reqmt qty rounding co-products/by-products |
| 154140 | Incorrect comp. quantities after header qty change |
| 886947 | CO02: Long material number/MPN displayed in internal format |
| 647638 | CS:Routing Error...Convert Planned Order To Production Order |
| 44308 | Batch determ:error in search strategy in prod.order |
| 111816 | Incorrect results availability check |
| 658086 | Rounding requirements qty of components during order creatn |
| 186698 | Creating order with reference: Incorrect times |
| 93874 | Incorrect requirement quantity f.variable-size item |
| 122054 | Termination when creating prod. order by copying |
| 757675 | Search help for work center: No short cut (=) |
| 86363 | Prodctn order: Scrap 100%-->Crash - division by 0 |
| 562187 | RKO: Commitments for external requisitions |
| 519044 | Enhancement subnetwrk possible in sp of product cost collctr |
| 352709 | Dump during ATP in the production order |
| 681078 | Termination Message CO 097 during Order Creation |
| 151134 | Incor.results avail.check w/ alt. or discon. group |
| 129360 | PPPR: Standard value units are incorrect in print |
| 164434 | Reading master data: Components go missing |
| 162319 | Incorrect component quantity for Read Master Data |
| 32900 | Allocating source of supply f. PReq in network & prod. order |
| 210031 | CO01 with reference: FORM_PARAMETER_TOO_SHORT |
| 82901 | ITAB_ERROR in LCOITU27: Problems with note 76287 |
| 35465 | Reassigning a created component in network/order |
| 529503 | Error message CO257 when extending subnetwork |
| 382768 | Error in Note 377648 |
| 203064 | Class node: Error in the low level configuration |
| 388653 | Follow-up note on Note 366535 |
| 308461 | Rounding error in quantities of alternative items |
| 93354 | Incorrect component qty when changing header qty |
| 110734 | CO01: Requirement quantity of a size not rounded |
| 165907 | Missing parts list displayd for compnents w/o check |
| 392684 | Note 360915 implemented in SP SAPKH46B25 incorrectly |
| 102328 | Missing initialization ATP server |
| 644772 | Error message 29090 during order creation |
| 401513 | Creating with reference: Settlement rule invalid |
| 496184 | CO01:progrm terminatn NOT_FOUND in Co_Bt_Caufv_Read_With_Key |
| 73107 | Allocation of phantom assemblies in productn order |
| 382210 | Error message 8J700 when creating production order |
| 81656 | CO01: Component allocation in the collective order |
| 134523 | ME52: PReq created from order cannot be deleted |
| 600645 | No rqmt qty for discontinuation components and alternatives |
| 321382 | Invalid storage location copied for component |
| 366404 | Termination when enhancing subnetwork |
| 93776 | CO01: Component allocation after upgrade from 2.2* |
| 74960 | BOM explosion: Phantom with alternative group |
| 206509 | Creating production order/process order with ref. |
| 312135 | CN22/IW32/CO02: Purchasing data is initialized |
| 89548 | Production order: Error C2087 or BS001 or OPR_NOT_FOUND |
| 168377 | Creating with ref. and external processing |
| 183065 | CO01 Creatn,rel.,chnge->dmp dring J_3AFSRESB postng |
| 98901 | Unit size number not in EA without decimal places |
| 66173 | Production dates postponed by one day |
| 122583 | Trmntn 'NOT_FOUND' after implmntatin of Note 112062 |
| 451331 | Batch determination not possible after import of plug-in |
| 79696 | Deleting operations when deleting sequences |
| 83770 | CO01/2:'Reset availability' sets status MACM |
| 368870 | ATP for the component in prod. order appears after pressing |
| 50454 | CO40: Incorrect component assignmnt/backflush indic. |
| 209735 | Configuration owner of material variant changes |
| 178939 | Transfer of co-products |
| 188705 | Components with component scrap incorrect |
| 117321 | CO01,02: Rounding error for component quantities |
| 124029 | GR expected although no quantity update |
| 130769 | Availability check production orders |
| 543054 | WBS element cannot be deleted |
| 170463 | Routing selection - selection priority not transfd |
| 141776 | Overall confirmation date for collective orders |
| 83253 | BCD_FIELD_OVERFLOW: Field MSFCV_IMP-DZEIT |
| 323685 | a cross-plant planning: creating batch |
| 625774 | Dynpro sizing conflicts in production and process order |
| 69781 | Production finish date moved by one day |
| 64271 | Prod.order: Field RESB-BAUGR filled incorrectly |
| 80998 | Availability check in production order network |
| 109214 | Trmntion for availability check in collective order |
| 152477 | Rounding error in qty changes in production order |
| 128442 | Production order create not validating size entered |
| 101463 | Prod.order:No material description i.mssng prts lst |
| 130191 | Dates sub-operation not on non-working day |
| 573153 | Error message KD082 when adding a co-product |
| 216678 | No valuation type for materials without grid |
| 169024 | Comp.qty in prod.order 0 if status RELR Rel.rejectd |
| 196631 | CO01, CO02: Incorrect component quantities |
| 119159 | Collective order: Material type is non-valuated |
| 397695 | Temporary CUOBJ in table AFPO |
| 316244 | Storage locations deleted after phantom assembly inserted |
| 117506 | Prod.order: 'must not be settled' in spite of ARu |
| 616987 | Issue storage location not taken from production version |