841302 | The message number is not saved in the order header |
168401 | Status incorrect in operation after 'Do not execute' |
1158497 | MAM:Tech. Object replication not triggered for Notif. create |
175688 | No automatic actions after reading master data |
147916 | Assmbly order: inconsistncies after confign changes |
170948 | Status inconsistency in work breakdown structure |
386676 | WBS element (CRTD) can be assigned to network header (REL) |
313230 | Operation release possible although WBS created |
167170 | Prod. order release possible although WBS created |
116002 | IW32: Dump in refurbishment order w.maint.task list |
209945 | Deletion of component despite WM material staging |
563333 | Repairing activities with missing statuses |
676083 | Network Activity Elements Unable to be Released |
214352 | APO->R/3: Order status changes to Created |
66510 | Create order: locking the order header |
484067 | Create network,template standard network:release immediately |
705324 | Status fields/status InfoObjects |
452306 | Operations released after reading master data |
598757 | Incorrect inspection lots due to serial numbers |
169666 | Problem w. release of production orders |
547881 | Order release: Inspection lots without technical object |
113815 | Automatic generation of settlement rules |
440186 | FAQ 2: Validation and substitution in the project |
983612 | SAP Project System Integration with SAP xRPM 4.0 |
1351411 | SAP Project System Integration with Portf and Proj Mgmt 5.0 |