Transaction SAP COR1 - Créer ordre de process

Notes associées
838515CO02: You cannot return to variant transaction
117120Search for PP-PI notes
306639Incor.reqmt qty rounding co-products/by-products
111816Incorrect results availability check
658086Rounding requirements qty of components during order creatn
311929Copying from order: Acct assignment to sales order
681078Termination Message CO 097 during Order Creation
151134Incor.results avail.check w/ alt. or discon. group
382768Error in Note 377648
308461Rounding error in quantities of alternative items
392684Note 360915 implemented in SP SAPKH46B25 incorrectly
644772Error message 29090 during order creation
496184CO01:progrm terminatn NOT_FOUND in Co_Bt_Caufv_Read_With_Key
600645No rqmt qty for discontinuation components and alternatives
206509Creating production order/process order with ref.
451331Batch determination not possible after import of plug-in
595217Control recipe creation performance
418677Long text is not deleted when reading master data
178939Transfer of co-products
117321CO01,02: Rounding error for component quantities
625774Dynpro sizing conflicts in production and process order
109214Trmntion for availability check in collective order
573153Error message KD082 when adding a co-product
397695Temporary CUOBJ in table AFPO
316244Storage locations deleted after phantom assembly inserted
616987Issue storage location not taken from production version
315865Note obsololete! Implement Note 354242 instead
541861COHV: Reset availability data for assembly orders
214941Note 209419 (table RSPSP f.prod.order) not complete
308692Goods receipt indicator for non-valuated material
198932ATP messages are missing in the release log
643642No goods receipt for co-products
368830Reading master data for co-products
93714Cross-plant planning: Create batch
393622Rounding error with component quantity change
848144'Recursiveness allowed' for input materials
327016BCD_ZERODIVIDE for order processing
655803Insert co-product: SBDKZ incorrect
646372Source determination in the production and process order
169794Material variant as a co-product
314948Bill of material information in co-product item
709062Error in goods movements for PP-processes with BOM 7
159014Batch is not copied to totals record
187711Read master data does not read short text
507248No credit generated during standard cost estimate
520106Reduction of the data control blocks part 1
521432Reduction of the data control blocks part 5
213434Read master data doubles order long text
136640Process order: Short text for recipe is missing
139685Performance problems w/ orders w/o header material
85896Confirmation sets up capacity requirements again
520231Reduction of the data control blocks part 2
135010Error in Note 133306 for collective orders
964608COR1: Incorrect conversion between order header units
43594CO01: wrong ord.fin.date (in-hou. prod. time = 0)
618805Supply area or LGORT determined wrongly if wrk centr changed
437907Work center calendar not taken into account
151824Error during auto.genratn w/ filter batch mgmt rqnt
209419Table RSPSP only supplied for networks
360915Assignment production order product cost collector
133889Over-confirmation for batch split
172215Transfer of 1st BOM line in PReq f. direct procurmt
182099Including master recipe: incorrect operation
660954Copying collective order with deletion flag
159802Termination for batch split in alternative group
594765Create with template:Account assgnmnt of co-prodcts incorrct
551926Program termination ILLEGAL_OBJART in cost analysis
514025Equivalence numbers are missing in settlement rule
160209Manufacture of co-products: settlement rule
519857Incorrect cost element in collective order
437999Incorrect requirements date for manually inserted component
189425CO350 in batch determination after split
173664@3Z@Collective note: Lost char. value assignments
439708Incorrect costing data during creation with reference
211446Mfr.of co-prodcts: Settlmt rule f.non-valuated matl
315082Short dump CALL_FUNCTION_NO. in CO_BC_RESB_VB_CHECK
204000Process order: Operation release and log
352327Process order: Changing functional area
300800Modification: Order for a configurable material
607089Valuated goods receipt for nonvaluated material
80692Batch determination after withdrawal
377648Incorrect requiremt quantity after header change in quantity
130401Sub-operation/work element has incorrect dates
150839Error in Note 149359
372819Order item is not transferred to X_BNCOM
181328Header quty chnge in order network:unrounded quties
521553Reduction of data control blocks part 6
328077CO630 and unnecessary settlement rule
566814Planning file entry for MRP is not set
84066Date fields for sub-operation/elements empty
567360Planning file entry for MRP is not set
327728No settlement rule after Read master data
519373Various function groups are loaded unnecessarily
206538CO01/08/R1: Configuration n copied fr sales order
137331Process order: Batch determination after withdrawal
426192Manufacture of co-products apportionment structure, cost di
200176Display of checking group in the missing parts list
355816Authoriztn check missing whn branching to transactn
88877Availability check in the order without components