Transaction SAP MF50 - Tableau de planification - modifier

Notes associées
676286Short dump PERFORM_CONFLICT_TYPE in MF50
159907Order finish date: Scheduling with production dates
119265MF50:In spite of Cancel/Exit plnd order is created
115871MF50: Rounding error
352440MF50: Planned order without number
84393MF50: changing several planned orders behind a cell
92336MF50: MS Excel termination due to incorrect path
165852Period total:SAFT consumed twice (MF50, MD04)
397515MF50: Message 61064 during planned order creation
42422MF50: Deletion and change on detail list dialog box
419198MF50: EXCEL - no decimal places
90048Release of production order in batch input mode
105029MF50: Quantities when calling Excel to incorrect data
91233MF50: Incor. quantities in Excel w.unit conversion
40744MF50: Line shift view: Terminat. when calling Excel
194993MF50: Order finish date = production end date (3.X)
135828MF50: EXCEL - no decimal places
140837MF50: Rounding for entry or processing
115380MF50: Scrap quantities
97772MF50: Screen 0480 works incorrectly
172287BOM in planned order exploded incorrectly (2)
140541Rep.manufacturing:Short dump w.'NO_PLNUM_SPECIFIED'
1227020 FAQ : Planning table details
602625MF50:order finish date for night shifts
338715Order with zero duration: basic dates incorrect
40534Planned order: Order finish date moved by one day
84098Repet.manufacturing:planned order moved by one day
713286MF50: Alternative unit of measure vs. Base unit of measure
855524MF50: incorrect scrap qty in planned orders
73491TIME_OUT or operation dates on incorrect day
107004Repet.manufactrng:ordr finish date one day too late
88432BOM in planned order exploded incorrectly
73631Sub-operation: Incorrect dates for duration zero
137543Mf50: Rounding problems when changng unit o.measure
111531MF50: Dates in the planned order one day too late
92841Rep.manufacturng table:incorrect order finish dates
362238MF50:quantities in incorrct cells whn calling Excel
148891Error in dispatching/scheduling/time determination
51715Planned order: Reset buffer tables
384805Dump MESSAGE_TYPE_X in MF50 with scheduling
63630Order finish date one day too early (night shifts)
631277TTZ: No update of ABMNG for reporting point backflush
99608MF50 with monthly periods: timeout for Feb.29.2000
99604MF50 and SOP: Excel connection
165940MF70: Planned order quantities are incorrect
380389ONR00 entries for object types O1, O2 without KBED
632951Basic date in planned order incorrectly adjusted
310714MF50: basic finish date changes with night shift
36220MF50: Problem with monthly periods in the year 2000
614485Takt scheduling incorrect in case of several sales orders
632598MF70:Incorrect GR qties, short dump TABLE_INVALID_INDEX
396366Incorrect basic finish date in repetitive manufacturing
209109Basic dates are on non-working day after adjustment
520081ONR00 entries for object types O1, O2 without KBED
119518No rdction of rough-cut plnning+rate-basd capacties
364286MF50: Conversion of planned order does not work
61924BS001 'No status object is available for &'
325734Dispatch planned order: operation shrinks / CY 744
96413Double capacity requirmnts recs / termination CO888
438291Planned order (Conversion): Scheduling type with times
536617Order dates of planned order incorrect for night shifts
186315MF50/MC94: Excel --> changing the default file path
194019Basic dates, production start are incorrect
184543Scheduling planned order: Incorrect component dates
309286MF50: Short dump NO_PLNUM_SPECIFIED
178525MF50: Explanation --> scheduling as of Release 4.0
150705Planned orders displayed in dialog box despite of deletion
210365Requirements dates of material components empty
92050Creating run sched. headers w/ same validity period
324526MFxx: Inconsistency of PLAF and BLPR
316081ONR00 entries for object types O1, O2 without KBED
52065Deleting run schedule headers/cost collectors
46237Consulting: determination of the order dates
148632Incorrect results in capacity requirements planning
194802Installation PCS Automotive Supplier 4.6B
186589Inconsistent planned orders for parallel accesses