158881 | AFS: no BOM expl. in plnd ord for NOGRID material |
160506 | AFS: Plnd ord qty = ? when returning from 'AFS size |
158628 | AFS: Plnd ord qty = ? when returning from 'AFS size |
155525 | AFS: Plnd ord qty = ? when returning from 'AFS size grid' |
641489 | R/3->APO: Unchanged planned orders sent to APO (BAPI) |
605282 | MD11/MD12: Components' requirement dates |
85583 | MD12: Deleting planned order |
149363 | Genratng plannd ordr w/o AFS grid info/plannd order |
743575 | R/3->APO: Unchanged planned orders sent to APO |
126723 | ECR: Too many components in planned order |
338715 | Order with zero duration: basic dates incorrect |
442419 | Underconfirmation for conversion of pl. ord. -> prod. order |
397515 | MF50: Message 61064 during planned order creation |
350452 | Unexpected display of Marker button in Planned order |
169827 | ATP: Insertion of simulated requirement incorrect |
529275 | Plnd order:ATPSERVER not current in case of reqmts diversion |
329948 | SAPLCXOT: "PARAMETERS_NOT_VALID" |
96107 | Order: scheduling with 'Adjust basic dates' |
166296 | Planned ord: Ref. op. set referenced sev. times |
82096 | MD13,MD12: Display configuration, revision level |
818657 | Planned order with alternative production plant not shown |
421497 | Rounding problems when splitting requirements |
157996 | Incor.qty distr.of compnents in plnd order procssng |
360886 | Sub-operation deallocated after scheduling |
130889 | Requirmnt qty 0 for components in AFS planned order |
34750 | Dispatch/deallocate operation: Change order quantity |
158595 | Assembly: incorrect delivery proposal |
376908 | Planned order has component with quantity Zero |
171968 | Incorrect requirements dates in planned order |
312087 | Planning check for planned and production order |
80200 | Display of availability dates in planned order |
449429 | Sub-operation: KBED-VORNR does not contain operation number |
516684 | Rounding problems when splitting requirements (2) |
166358 | Missing data for subcontracting components |
158732 | Missing compnts in prod.order f.conv.from plnd ordr |
447451 | Basic finish date is moved in planned order |
130864 | Reqments date components in scheduled planned ord |
184898 | Missing component assignment in the planned order |
99631 | Quantity adjustment for alternative BOM items |
146132 | Planned order: Error when component display called |
85640 | Planned order: Characteristic grouping |
351178 | Incor statistics drng update sales order fr plannd o. |
647279 | Planned order: Unit of measure with availability check |
129661 | Dep.requirements date/scheduling planned order 1.0D |
443446 | Planned order/SC procurement proposals: Availability check |
86369 | MD11,MD12: directly produced compnts in plnd order |
69001 | Planned order: requirements date of mat. components |
165940 | MF70: Planned order quantities are incorrect |
380389 | ONR00 entries for object types O1, O2 without KBED |
128122 | Scheduling of planned order: Changing work center |
632951 | Basic date in planned order incorrectly adjusted |
141939 | AFS: Comp.in Prod.order w/o category after conv.from chgd.Pl |
386279 | Lead time/lead-time offset in planned order |
328045 | 'AFS adopt grid qties' button without function |
350271 | Incorrect conversion between order units |
632598 | MF70:Incorrect GR qties, short dump TABLE_INVALID_INDEX |
362265 | Requirmts dates in pland order w/phantom assemblies |
129707 | Reqmnts date components in scheduled planned order |
183083 | J_3AMRP4: "Fixed" indicator/production order |
209109 | Basic dates are on non-working day after adjustment |
377792 | Scheduling planned order for recipe incorrect |
39032 | No BOM explosion with production version |
207998 | MRP: Scheduling in the planned order |
332255 | Dump for planned order scheduling with phantom |
52784 | MF40: component quant. + MF43: secondary require. |
520081 | ONR00 entries for object types O1, O2 without KBED |
192714 | Scheduling via capacity versions |
764611 | FAQ: Static assembly |
164722 | AFS Check report for receipts/requ. without date |
517373 | Move time from matrix scheduled incorrectly |
416932 | Confirmation planned order: No reading of component assignme |
162845 | AFS Check report for subcontracting planned orders |
582320 | MD11/MD12:Error during basic date determin. in planned order |
324542 | CM21: Error when dispatching AFS planned orders |
386345 | Lead time taken into account twice in the planned order |
625196 | Planned order: Rounding of co-products / by-products |
309081 | Requirmts dates in plnd order w/ phantom assemblies |
781632 | Constant new explosion in SAP APO after changes in SAP R/3 |
436360 | MD12 scheduling Planned Order incorrect dates in J_5CL |
190002 | MRP, planned order,... incorrect BOM explosion |
356120 | Planned order:refnce.operation set referenced several times |
536617 | Order dates of planned order incorrect for night shifts |
781749 | R/3-APO: Method for the planned order integration |
651537 | R/3-APO: R/3 re-explosion does not cause re-explosion in APO |
90381 | Date shift by one day in the order |
611153 | APO<->R/3: Planned order dates check (modification) |
103717 | Quantity adjustment after manual component change |
46155 | Subcontr.and phant.assemb.:SK-BED not LB-BED UK&NOTE_SYMPTOM |
303485 | Runtime problems during ATP check |
194019 | Basic dates, production start are incorrect |
318616 | Plnd ordr:Ordr start date later thn ordr finish dte |
184543 | Scheduling planned order: Incorrect component dates |
90663 | Capacity reqs planning: Unit unknown; distribution |
204409 | Incorrect requirements dates during dispatching |
340018 | Error using 'Adjust Quantities' w/o maintaining Bundles |
602625 | MF50:order finish date for night shifts |
160736 | Configuration for result-oriented order BOM |
122019 | Error in date proposals during component check |
411618 | MRP explodes material BOM instead of WBS BOM |