Transaction SAP MD03 - MRP Planif.indiv. à un niveau

Notes associées
512790Performance problems when processing many orders
52038MD01: Resched.check when ord.finish = per.end
1119048Scheduling agreement item not proposed for settling
1505814.6A Characteristics planning with <, <=, >, >=
425143Interactive planning: Incorrect/missing components
319434Dump when scheduling several planned orders
686785Incorrect or negative quantity in field EKPO-MENGE
206399MRP: Material shortage in MD04 after planning
113115Components are lost during manual rescheduling
133438Characteristics planning NOT w/ usage of user exit
126723ECR: Too many components in planned order
580414EBP: PReqs generated by MRP are not transferred
132890Charctristics planning: supportng points not stored
31156Selection of alternative bills of material
324120Dump in planning run: owner MARA ... does not exist
77408Discontinued parts and safety stock
808291VL10D: delivery quantity too high
865621AFS MRP (/AFS/MD02) halts with exception message no. 61060
49778COMPUTE_FLOAT_ZERODIVIDE in SAPLM61U
529275Plnd order:ATPSERVER not current in case of reqmts diversion
426422CALL_FUNCTION_CONFLICT_TYPE during takt-based scheduling
314100Periodic lot size: delivery date not at beginning of period
73558Dispatch planned order: Incorrect component dates
331923MD04: Returns delivery is not displayed
143487BOM explosion in planned order
625857351451: Work breakdown structure BOM is not transferred
154161BOM explosion in planned order III
148029BOM explostion in planned order II
789711MD03: Unanticipated message M8 815 in requirements planning
81377Source determination for CC delivery
359288Incor.available qntity for scheduled planned orders
400155Period lot size: delivery date not on start of period II
77577Performance mat.req.s planning, production versions
73467Discontinued parts with distribution key
132494Forecast:incorrect period with fiscal year variant
410754Delivery schedules generated manually not changeable
351738Error in Note 189826: Rough-cut scheduling
78244Planned order: Change in single-item planning
205121MD01: Incorrect dates during date specification = 3
40847Scheduling for schedule lines
160004AFS Copying of secondary requirement
120546MRP: Procurement proposal in the past
797366MD03: Message ME 814 with stock transfer items
421465Corr. Note 409130: New delivery schedules cannot be changed
447451Basic finish date is moved in planned order
51715Planned order: Reset buffer tables
107942MD03 ME38 delivery schedule without components
328907MRP controller as creator of PReqs from MRP run
501895Returns purchse order not taken into account for MRP type V1
53090Planning performance, stock transport orders (3.0C)
71482Discontinued parts and make-to-order production
371016MRP: Material is not planned for MD01 / MDBT
362704Inappropriate JA text for MRP element data
416199Planning mode 1: no scheduling of firmed planned orders
51706BOMs: Low-level code 999 for co-products
132623Discntnuatn after consumption:missng rqmts divrsion
188225MD01: Planning file entry not reset
65737MRP run: Error message 06 859 without further info
369732MD04 Missng stck transport schedlng agrmnts in issuing plant
747349Problms through EKPO-MENGE is <> than total of EKET-MENGE(2)
632951Basic date in planned order incorrectly adjusted
174198Man.rescheduling of subcontractor delivery schedule
547465R/3->APO: COM error 079 after planning run in R/3
165852Period total:SAFT consumed twice (MF50, MD04)
78091Planning mode 1 and change issue storage location
73780 Production order has no effect on availability
301681Doc: MRP takes no customer consignment stock into account
614485Takt scheduling incorrect in case of several sales orders
664084Sel. f. several valid scheduling agreements in source list
199757MD04 Reservation loses ref. to sales order
362265Requirmts dates in pland order w/phantom assemblies
67589MD:Assigned shipping notification in wrong segment
81469MRP, long-term planning
141803Subcontractor requiremnts in wrong planning segment
39032No BOM explosion with production version
369032Error TD607 in PFS upload / performance MRP
207998MRP: Scheduling in the planned order
332255Dump for planned order scheduling with phantom
42511BOM: Error in low-level code assignment
171363MRP type V1/V2 and stock transfer reservations
84823Pland.orders in plnng time fence for prd lot size
172208MD01: Plant = vendor, no planning file entry
425314MRP and fiscal year variant: Incorrect dates and quantities
76747MRP: EM 61060 'The date 00/00/0000 not convertible'
204802KKS2, CO88, production order: Error KV216
409130Planning: Subcontr.deliv.sched. w/ partl delivery changeable
413887Incorrect configuration when changing a schedule line date
960410Forecast value in current period with decimal places
145272MRP:Stk transfer w/ plant = vendor f. sched. agrmnt
84186Planning file entries and external requirements
186608Periodic lot size: Order proposal too late
386345Lead time taken into account twice in the planned order
625196Planned order: Rounding of co-products / by-products
842976Component in planned order although not production-relevant
430184Maintenance order: missing rescheduling check
211628MRP: Stock transfer with vendor = plant
140661Rescheduling of capacity-firmed planned orders
89701Component allocation lost (planning mode 1 or 2)