Transaction SAP MD02 - MRP - individuelle - à plus. niveaux

Notes associées
865621AFS MRP (/AFS/MD02) halts with exception message no. 61060
51706BOMs: Low-level code 999 for co-products
512790Performance problems when processing many orders
924163MD06 : Plant stock shows incorrect value for CS materials
174122Missing influence of parameters for online run
42511BOM: Error in low-level code assignment
52038MD01: Resched.check when ord.finish = per.end
928831MD06 : Plant stock shows incorrect value for CS materials
1505814.6A Characteristics planning with <, <=, >, >=
400123Endless loop for single-item planning (multilevel) (II)
425143Interactive planning: Incorrect/missing components
128300Man.resched.sched.agrmnt schdle line/PReq w/o WEBAZ
191949ECH: Performance improvement
113115Components are lost during manual rescheduling
133438Characteristics planning NOT w/ usage of user exit
126723ECR: Too many components in planned order
580414EBP: PReqs generated by MRP are not transferred
122057MRP - multi-level variant configuration
176062Nonvaluatd config. creats requirmts relevant to MRP
339273Rescheduling after simulating MD02: components lost
208852No BOM explosion in spite of planning mode '2'
132890Charctristics planning: supportng points not stored
31156Selection of alternative bills of material
77408Discontinued parts and safety stock
1088714.5A: Assembly is repeatedly used in set processing
65277Bill of material: No explosion in MRP
49778COMPUTE_FLOAT_ZERODIVIDE in SAPLM61U
529275Plnd order:ATPSERVER not current in case of reqmts diversion
426422CALL_FUNCTION_CONFLICT_TYPE during takt-based scheduling
314100Periodic lot size: delivery date not at beginning of period
73558Dispatch planned order: Incorrect component dates
331923MD04: Returns delivery is not displayed
143487BOM explosion in planned order
625857351451: Work breakdown structure BOM is not transferred
154161BOM explosion in planned order III
148029BOM explostion in planned order II
789711MD03: Unanticipated message M8 815 in requirements planning
81377Source determination for CC delivery
359288Incor.available qntity for scheduled planned orders
400155Period lot size: delivery date not on start of period II
77577Performance mat.req.s planning, production versions
73467Discontinued parts with distribution key
132494Forecast:incorrect period with fiscal year variant
410754Delivery schedules generated manually not changeable
351738Error in Note 189826: Rough-cut scheduling
78244Planned order: Change in single-item planning
207197Additional info for Note 186608
205121MD01: Incorrect dates during date specification = 3
214371Multi-level planning cross-company procurement
40847Scheduling for schedule lines
120546MRP: Procurement proposal in the past
421465Corr. Note 409130: New delivery schedules cannot be changed
447451Basic finish date is moved in planned order
206399MRP: Material shortage in MD04 after planning
510291MD02 in the simulation mode: Discontinued part
51715Planned order: Reset buffer tables
328907MRP controller as creator of PReqs from MRP run
501895Returns purchse order not taken into account for MRP type V1
53090Planning performance, stock transport orders (3.0C)
71482Discontinued parts and make-to-order production
99694Using long instead of short term lot-sizing proc.
416199Planning mode 1: no scheduling of firmed planned orders
132623Discntnuatn after consumption:missng rqmts divrsion
188225MD01: Planning file entry not reset
65737MRP run: Error message 06 859 without further info
632951Basic date in planned order incorrectly adjusted
174198Man.rescheduling of subcontractor delivery schedule
547465R/3->APO: COM error 079 after planning run in R/3
165852Period total:SAFT consumed twice (MF50, MD04)
78091Planning mode 1 and change issue storage location
73780 Production order has no effect on availability
301681Doc: MRP takes no customer consignment stock into account
614485Takt scheduling incorrect in case of several sales orders
142207CUD0_OBJECT_HAS_CONFIGURATION and CONVT_NO_NUMBER
664084Sel. f. several valid scheduling agreements in source list
199757MD04 Reservation loses ref. to sales order
362265Requirmts dates in pland order w/phantom assemblies
67589MD:Assigned shipping notification in wrong segment
393835MRP: Endless loop with single item planning - multi-level -
81469MRP, long-term planning
141803Subcontractor requiremnts in wrong planning segment
39032No BOM explosion with production version
369032Error TD607 in PFS upload / performance MRP
31381Poor performance in materials planning
207998MRP: Scheduling in the planned order
332255Dump for planned order scheduling with phantom
171363MRP type V1/V2 and stock transfer reservations
84823Pland.orders in plnng time fence for prd lot size
172208MD01: Plant = vendor, no planning file entry
425314MRP and fiscal year variant: Incorrect dates and quantities
76747MRP: EM 61060 'The date 00/00/0000 not convertible'
204802KKS2, CO88, production order: Error KV216
409130Planning: Subcontr.deliv.sched. w/ partl delivery changeable
960410Forecast value in current period with decimal places
145272MRP:Stk transfer w/ plant = vendor f. sched. agrmnt
416932Confirmation planned order: No reading of component assignme
84186Planning file entries and external requirements
186608Periodic lot size: Order proposal too late
386345Lead time taken into account twice in the planned order