83323 | Saving a planning with planning type S076 |
141830 | Delta planning: incorrect lock entry in MC93 |
82249 | Internal error 046 when creating flexible planning |
528593 | Error on selection screen |
74434 | Distribution function in key figure view is incorrect |
125419 | Planning table: Performance improvement |
127999 | Planning table: Short dump - COMPUTE_FLOAT_ZERODIVIDE |
116568 | Planning table: units of measure for actual data |
154357 | Planning table:Dstrbtn function for key figure view |
83071 | MC93/MC94: Disaggregation in level-by-lvl planning |
198272 | Generation error flex. planning/planning hier. (2) |
83038 | Planning table: Macro operator 'Line total' |
93279 | Program termination during forecast for help line |
85655 | Start date of the planning periods is incorrect |
123065 | Planning table: 0 column after period splitting |
60153 | Incorrect capacity calculation in planning (SOP) |
82611 | Planning table: Not enough periods ready for input |
123537 | Planning table: Final macro delivers wrong values |
93891 | Program termination when scrolling repeatedly |
69243 | No actuals for dual standard SOP |
67394 | Zero stock level in macro with column selection |
78305 | Product allocation: lock indicator does not work |
124486 | Planning table: error after saving |
53306 | MC94 Export to Excel does not correspond to view |
66596 | Macros for members in a level-by-level planning |
81683 | Transfer of key figure units to rough-cut planning |
74490 | Incorrect warehouse stock after period breakdown |
115812 | Levl-by-level plnning:Plnning start i.daily plnning |
134421 | Delta planning: Planning start for daily planning |
52133 | Macro calculation in the selected area |
44366 | Actual data - planning table / performance |
822122 | MC94: Maximum of six characteristics in header |
126570 | Macro PR delivers incorrect results |
117402 | SOP: Planning type without warehouse stock |
74395 | Delta planning: Excluding aggregated information |
83753 | Capacity rqmnts planning after executing a macro |
66268 | Incorrect unit change |
118453 | Scrolling in the planning table |
687705 | CAS: Customer potential analysis: LOAD_PROGRAM_NOT_FOUND |
90346 | Two-step planning table: no data transfer |
86939 | MA151 - T134 not maintained during planning call |
75925 | Own task list type for S076: MA361 on new material |
77712 | Capacity requirements are lost/swapped |
133764 | Allocations: Storing in incorrect version |
421497 | Rounding problems when splitting requirements |
89998 | Fixed issue line items are ready for input |
82553 | Invalid unit conversion for event line |
131460 | Planning table: Number of future periods < 5 |
160835 | Error message MA113 issued with incorrect factory calendar I |
1070631 | CAS: Customer potential analysis: LOAD_PROGRAM_NOT_FOUND II |
569828 | Techn. business year variant with period unit P & W |
842837 | CAS: Potential analysis: Update termination/no doc number |
99952 | MC94: Forecast with automatic model selection |
64300 | Mat.-dependent unit conversion in flex. planning |
67580 | Capacity utilization is only partially calculated |
306111 | Error MA824 when planning is accessed |
516684 | Rounding problems when splitting requirements (2) |
156436 | Correction for Note 100174 |
733442 | Forecast: Short dump COMPUTE_FLOAT_ZERODIVIDE |
192764 | Planning table: Actual data for aggregated planning |
609213 | MC94: PERFORM_CONFLICT_TYPE for consistent planning |
118512 | Previous year determined incrrctly for actual data |
82027 | Forecast profiles: Storage period unit 'Days' |
74628 | Rounding error during data backup |
71461 | Leading zeros of materials in the planning table |
83896 | Capacity reqs. incorrectly reduced or duplicated |
88526 | Cap.rqmnts planning: incor.key figure in table SAUF |
99604 | MF50 and SOP: Excel connection |
167621 | Generation error flex. planning/planning hierarchy |
100174 | Diff. period unit in two-step planning |
83350 | Hide capacity -> Incorrect key figure view |
106562 | Allocations: Runtime error TABLE_INVALID_INDEX |
88418 | Capacity reqs planning: no lot-size range change |
133919 | Consulting: Performance improvement flex. planning |
67822 | Incorrect planning start for daily planning |
212440 | Termin drng maintenc of customer potential analysis |
725135 | Delta planning should not be used anymore |
560657 | Performance improvement for the planning |
82997 | Error message MA102 incorrect |
210977 | Allocations:Lock of flexible planning is ignored |
86183 | Capacity requirements from past periods |
72281 | No fiscal year variant with a period |
93396 | Planning saved incompletely after navigation |
88480 | Cap. requirements planning: display error after job |
87665 | Capa.req.plg.: wrong period for mat./PRT and costs |
90663 | Capacity reqs planning: Unit unknown; distribution |
84067 | Cap.rqmnts planning: display of MAT/PRT and costs |
76721 | Macro functions ==> Collective note |
1382112 | Planning: BASME changed for planned information structure |
79957 | Copy data: incorrect results |
41634 | Preliminary Correction: SOP and Flexible Planning -> 3.0D |
840995 | MC94: conversion incorrect after drilldown |
527083 | Changes to info structures |
49739 | No resource load for flexible info structure |
65364 | Excel download: Change header information |
191130 | Special features of info structures not relevant f. planning |
82745 | Explanations on the 'Calculate proportions' funct. |
82407 | Cap. rqmnts planning w. rough-cut planning profile |
841358 | FAQ: Flexible Planning |