891061 | EL28 interval check and suppression logic |
217182 | Assessing - Execution although no assessing exists |
967468 | EL28 Estimates for old date when meter reading date changes |
790681 | EL28 Move-in or move-out date can be changed |
1127474 | EL28 System determines an expected consumption of zero |
963624 | EL28 No check for change of the meter reading date |
169050 | Entering double meter readings using EL28 |
212274 | Error message EL452 |
1539386 | Different meter reading date during order creation with EL28 |
300181 | Dialog box during order creation to device level |
885807 | EL28 Whole number and dec places aft modification not checkd |
183375 | Process meter read. orders of tech. installed devices |
171184 | Creating billing orders after cancellation |
166874 | Dependent validation: Cosine phi |
149961 | Overestimation factor with estimation of MR results |
177656 | Performance optimization within order creation |
163501 | Dependent validations not run through |
186651 | Met. read. dataproc.: multpl trig. of ident. events |
151163 | Event: ENTEREDIMPLAUSIBLE not triggered |
163360 | Validation 96 - Fixed value deviation |
200660 | Scheduled billing date in meter reading results |
306267 | Independent validation: Fixed value deviation |
170525 | Overview information for validations |
162904 | EL28:Serial switching - MR entry f. secondary meter |
167728 | Dependent validations: Short dump BCD_ZERODIVIDE |
171972 | Single entry: meter reading reason = contract change |
158676 | Extrapolation from period of previous year |
303353 | Extrapolation with base period category 'X' |
162565 | EL28: Entry for double-rate meters - MR status = 0 |
169549 | Overview information for validations |
308927 | Assessing with "real overflow" |
190433 | Meter reading to be billed differs from read MR |
208464 | Uploading MR results: plausibility check 96 |
162164 | Correction for MR results:No consumption adjustment |
166677 | Status update for billing data record |
1504438 | EL28/ICWC: Meter reading type when estimated w/ changed date |
1180536 | Active estimatn for resetting register during MR at move-in |
311677 | EL27: Consumption not adjusted when MR changed |
169607 | Billing data record status update |
173223 | Termination of interpolation |
165881 | Overview information for validation |
199117 | Met.read data processing: device 'choose' incorrect |
1574662 | Expected meter reading in overview of validations |
156510 | Suppression of meter reading orders |
167378 | Determining forecast start and forecast end |
158685 | Extrapolation termination for fixed value weighting |
335999 | EL28: EL401 future meter reading lower |
201982 | Enter MR results: No consideration of future MRs |
168254 | Update of a maintenance order |
151862 | Nonact. instal.aft.instal./remov.&move-in/out cycle |
186955 | Mult. meter read. order creation w. dev. replacemnt |
195559 | Endless loop in order creation reg. relationship |
177180 | Rounding decimal places for multiple registers |
329644 | MR estimation: Overflow during arithmetic operation |
214924 | EL28:Assessing prformd w.real prev.mtr readng rsult |
206015 | Interpolation of several MRs within entry interval |
149936 | Ignoring leading zeros for meter reading result |
188309 | MR entry: Tolerance limit valid. for sev. periods |
309840 | EL27 - EL29: EL401 also with balancing registers |
202822 | Periodic order creation for device |
184735 | Incorrect error message with order creation |
168249 | EL27: No SM order with control reading order |
196043 | EASIBI: Incorrect extrapolation budget billing plan |
154237 | Extrapolation after device replacement: Error E9014 |
215492 | Extrapolation for balancing consumption registers |
172393 | Extrapolation of move-in meter readings |
171410 | Repair f. repeated order creation (add.Note 170423) |
152010 | Extrapolation after device replacement: Error E9014 |
158032 | Extrapolation of balancing consumption registers |
188210 | Meter reading estimation: meter reader is deleted |
165677 | Wrong error class for tolerance limit validations |
148980 | Update of events at entry |
186696 | Assessing workflow not started |
302024 | EL28: Meter reading date ready for input f. move-in |
203739 | Interpolation on account of control MR order |
151877 | Meter reading order creation during deregulation |
304599 | Extrapolation with base period category 'X' |
162271 | Extrapolation from period of previous year |
200306 | Meter reading result extrapolated incorrectly |
149079 | Avoidance of double meter reading results on entry |
158921 | Display of forecast period in bill printout |
172514 | Term. in extrapolation during fixed value weighting |
187111 | Decimal places with meter reading results |
209788 | Identical meter reading time with meter readings |
166159 | Consider disconnection periods for extrapolation |
304127 | MR type - entry of MR disconnection / move-in/out |
332323 | Assessing: Assessing not triggered |
162659 | EL28 Prog. termination when accessing w. MR reason |
160112 | EL28: Meter reading type customer/estimation |
184874 | Extrapolation w/o estimated meter reading results |
174039 | Deregulation change of contract: Fixed MR date |
145527 | Meter reading entry: Consumption determination |
188364 | Processing MR documents of uninstalled devices |
188562 | Scheduled billing date in meter reading results |
145637 | Entry of MR results with change of supplier |
188855 | Meter reading data: List of information on validation |
166955 | Meter reading results with different MR date |
197610 | Assessing not recognized w. over-run estimatd value |