Description You can use this report to test the interface between an externalsystem (subsystem) and the WM system for confirming storage units. On the basis of this report, you can simulate the receipt of the IDOCWMTCID01 (Confirm TO) and thus also simulate the confirmation of thestorage unit. The test options of the report are described under the documentationfor the report RLTOCO00. Careful:> Testing this interface can lead to database changes. Ifprocessing is successful, the storage units defined in the IDOC orcertain transfer order items of a storage unit are confirmed.Precondition The data is passed on as an intermediate structure WMTCID01. Theselected storage units serve as a basis for IDOC processing. For eachstorage unit, one IDOC is created. The following options are availablefor confirming a storage unit:
- The entire storage unit is confirmed, that is, all the transfer orders
of a storage unit are confirmed without differences. To test this typeof confirmation, activate the parameter "Confirm entire SU (IST=SOLL)".
|