Programme SAP REAABR00MABI - Mass billing

Description
You can select contracts according to multiple criteria, and thenperform mass billing runs of these contracts. In the selection ofportions, billing orders with status 1 (not billable) and 2 (billable)are processed.
The selection conditions for the different blocks are OR operations,meaning you can supplement the selected contract intervals withadditional selection critera.

Precondition
All selected contracts must be billable.

Output
Billing documents are created.

Example
If you enter the contract interval 1 to 100, the portion 001, and thescheduled billing date 01/01/2000, all contracts between 1 and 100 aswell as those from portion 001 are billed whose scheduled billing datefalls before 01/01/2000.