Programme SAP RCPPLMZ3 - PLMZ Check Report

Description
Report RCPPLMZ3 purges table PLMZ. The following requirements MUST be
met to guarantee no difficulties when working with this report:
1. Individual components appear in duplicate online and others
do not appear.
2. The print report correctly identifies assignments.
3. In table PLMZ, the following situations may occur:
3.1 Duplicate assignment numbers exist (ZUONR).
If you are working with engineering change management,
double assignment numbers are correct. If engineering
change management is not used, no duplication should occur.
3.2 Duplicate counters exist (ZAEHL).
This can only be problematic if the ZUONR for the records
is also identical because then the records exist with the
same keys.
3.3 Records with duplicate contents exist although the keys
are different.
If unsure, contact the department for routing development at SAP AG
before running this report.