Description The report is for converting planned orders into production orders inbatch. Processing can be logged either using a conversion log thatcontains all information messages or by outputting an error log thatonly contains planned orders that cannot be converted with errormessages. The planned orders that cannot be converted are alsocollected in a batch input folder and can be processed using batchinput tools. You can create an error folder for every MRP controller. Workflow can be used to inform the recipient (given as a parameter) ofthe creation of the error folder. You should note here that in thestandard version TS00408210 event linkage is activated for the triggerevent. If an error folder is created for every MRP controller, therecipient entered in the MRP controller master record is informed. Ifno recipient if entered there, then the recipient entered as aparameter in the program is informed. You can carry out the selection in the form of a test. In this caseonly the planned orders selected for conversion are output. Parameter:
- Test run: Carries out the conversion as a test. The planned orders
selected for conversion are simply output in a log.
- Production order type: Key required to create a production order (or
transaction CO40).
- Only error log: Only outputs the unconvertible planned orders with
error messages in the log.
- Error folder per MRP controller: Creates a separate error folder for
every MRP controller.
- Receive folder according to view: It the indicator is set then the
error folder is not deleted after running in batch-input.
- Creator of error folder: User who is entered as creator in the error
folder
- Send mail: When a batch input folder is created it sends a mail to the
"recipient" (default) or to the relevant MRP controller.
- Express document: Sends a mail as an express document.
- (Alternative) recipient: Recipient of mail in case no recipient is
entered in the master record for the MRP controller responsible.
- Receive folder according to view: If the indicator is set then the
error folder is not deleted once the batch input has been processed. Selection criteria for planned orders
- Creation date days before/after: Interval in calender days within which
starting from the system date, the creation date for the selectionlies. The interval is only taken into account if the parameter
- "Select creation date" is set.
Output
- Conversion log/error log
- Batch input folder not with convertible planned orders
- mail
|