Programme SAP J_1SZEB0 - IS-M/SD CH/V: Create Seq.File from PTT Number Plan for ZEBU Setup

Purpose
Programs J_1SZEB0 and J_1SZEB1 are used to load the PTT number plan forbundling and sacking into the SAP tables J_1SORGZEB and J_1SZUOZEB.
Program J_1SZEB0 converts the PTT number plan for bundling and sackingto an SAP format and generates a temporary file ISP_PTT_ZEBUDAT, whichis used by the loading program J_1SZEB1.
The PTT supplies an Excel file. This file must be converted to textformat (see Data Format). The second step is to convert the text file tothe structure described below.
Data element,,Length,, ,,Description
_______________________________________________
Fr. PCd,,,,,,4,,,,Postal code from (4-digit)
Dash ,,,,,,1,,,,Dash ´ - ´
To PCd.,,,,,,4,,,,Postal code to (4-digit)
Blank,,,,,,1,,,,Space
Level 2,,,,,,25,,,,PCode for 'Ortsammelbunde' (4-digit)
Level 3,,,,,,25,,,,PCode for 'Durchgangsbunde' (4-digit)
Level 4 ,,,,25,,,,PCode for 'Leitgebietsbunde' (4-digit)
Level 5,,,,,,25,,,,PCode for 'BZ Bunde' (4-digit)
Sack,,,,,,25,,,,Text Sack address

Prerequisites
1. The logical path must be maintained. Logical path: ISP_PTT_ZEBUDAT
2. The logical file name must be maintained: ISP_PTT_ZEBUDAT
Please adhere to the order in which the report should be processed.

  • J_1SZEB0 (Create sequential file from PTT number plan for ZEBU struc.)

  • J_1SZEB1 (Set up ZEBU file from PTT number plan)

  • Program J_1SZEB0 can be restarted if the prerequisites are fulfilled.

    Output
    The following physical temporary file is generated:
    ISP_PTT_ZEBUDAT (SAP ZEBU temporary file)

    Activities
    Do not change the physical SAP file name ISP_PTT_ZEBUDAT.