Title Follow-On Documents for the Entry Document Purpose This report creates a list of documents that have been assigned to anentry document in Waste Management> in order to documentprocessing steps and save dependencies. The documents are assigned when the following processing operations takeplace:
- The entry document references entry documents in the split>
function
- The entry document references material documents during operations that
cause a change in stock in inventory management
- The entry document references a material document that references
another material document during reversal operations In this case, both material documents are displayed. From the list, you can display the entry and material documents assignedby double-clicking them.
|