Programme SAP UMG_ADD_PREP_STEP - Execute additional Preparation Steps

Purpose
The report UMG_ADD_PREP_STEP provides a list of reports which must beexecuted before the start of the preparation of a Unicode conversion.Each report corrects or deletes data in various tables. You can eitherrun all reports in one step (a background job is scheduled) or you canrun one single report in the dialog process. Each report can be executedas often as necessary. For each of the reports a note exists which isdisplayed at the beginning of the report log.
Since the runtime of some of the reports is long, it is recommended torun all reports in background in a single step.

Features
After starting the report you see the main screen which is divided intothree parts:
In the top left corner there are several icons which are used for...
@15@...running a single report: mark a report in the tree and press the"Start Preparation Step" button. The selected report is executed indialog. The button remains disabled until you have executed all reportsin a background job.
@15@(Background) ...running all reports: A background job is scheduledand started (Name: UMG_PMIG_PREP_JOB). The job executes all reports inthe list consecutively. The tree control is not updated automatically.Please use the refresh button to update the screen.
@42@...refreshing the tree control: Press the refresh button to updatethe display of the tree control in the lower left corner of the screen.
@38@... checking for missing reports. After pressing the check buttonyou get the list of reports which are not available in your system.
@01@...confirming warning messages: It might happen that a report writeswarning or error messages. Please check these messages by doubleclicking on the report in the tree control. What to do in case ofwarnings or errors: please read the note given for a report at thebeginning of the log and if necessary open a CSS ticket. If the problemwas fixed, you can mark the report in the tree a press the "Confirm"button. All warning and error message of the log are changed to infomessages.
@M4@...displaying the status of background jobs: Transaction SM37 iscalled if you press the "Job" button. Here you can check the status ofthe background jobs started by UMG_ADD_PREP_STEP.
@0S@... display this help.
The lower left corner of the screen consists of a tree showing the listof reports which should be executed. Different colors are used to showthe status of a report:
Initial, no color: The report has not be executed yet.
GREEN: The report has been executed at least one time. No warnings orerrors occurred during execution.
YELLOW: The report has been executed and there are warning messages orthe report is not available in your system. Please check the log of thereport for warning messages. If the report is not available please readthe note given in the log and try to create the report by a correctioninstruction or manually.
RED: The report has been executed and there are error messages.
Double click on a report name in the tree to display the log in theright part of the screen. Please note: a "Reset All" in transactionSPUMG deletes also the report logs in UMG_ADD_PREP_STEP.
The right part of the screen is used to display the log of a report.Please check the log for warning or error messages.

1457258Correction instruction for the Additional Preparation Steps
662215SPUMG and SUMG in Basis Release 6.20, 6.40 and 7.0X
1089012Cleanup table INDX(PE)/(PC)
1302042Cleanup for table INDX(KU)
1388649Report RFPAYM_UNICODE_VARIANTS cross-client
1294414Cleaning up table INDX (VM/RT)
712619Unicode conversion: Language key in ADRP table
679275T52C5: Report for Unicode conversion