Solution : https://service.sap.com/sap/support/notes/126811 (Connexion à SAP Service Marketplace requise)
Mots Clés :
0c additional key words afs, afs fixpack #04 corrects bugs, afs bug fixes, technical installation details, high priority notes, installation sequence, symptom fixpack #04, fixpack compilation, related notes, included notes
Notes associées :
127771 | Problems with EDI and AFS customer master fields |
127032 | Lot size X1 - problems with rounding value |
126267 | PIR: Check the MM/PP-Status in the TC: J3A1 |
126230 | |
126225 | Short dump for lot size X1/X2 with rounding profile |
126200 | |
126165 | Scope of check is ignored if mm/pp status is set |
126124 | |
126117 | Tax conditions not found in pricing |
126112 | |
126110 | MSO Problems |
126071 | AFS: PP Layout set 'Pick list' has no AFS data |
126051 | |
126018 | AFS: Modif. purchase order printout a. order form |
125789 | |
125788 | Independent requirements consumption reverse order |
125782 | Possibility to run J_3AMRPA and J_3AMRPB seperately |
125616 | |
125556 | Standard order Grid entry: Tabulator function (F7) |
125547 | KKS2: No target costs for selected target version |
125418 | Billing due list stops on error 378(8J) |
125406 | Problems with ATP check in production/planned order |
125341 | AFS Subcontracting |
125255 | |
125246 | SD:ORDERS IDoc stopps processing with false err.msg |
125236 | ATP in PP failed although it's stock available |
125181 | Missing exception messages in materials planning |
125126 | Pricing on size for rejected schedule lines |
125110 | Termination with lot size X1 and X2 during MRP |
125081 | |
125036 | |
125035 | |
124966 | Wrong CUA-Menue by creating document with reference |
124944 | AFS DI material master: dimension check with season |
124931 | |
124780 | |
124614 | |
124559 | CK11/Prod.order.: Wrong taken qty. with alt. unit |
124497 | Missing dates after using AFS filter in MD05 |
124442 | Shipping notifications are ignored by MRP |
124420 | |
124367 | |
124352 | Rescheduling horizont: wrong free available stock |
124342 | |
124340 | Firming indicator works wrong |
124324 | AFS: Goods movement not possible for batches |
124318 | |
124313 | AFS Batch number at goods movements |
124308 | |
124289 | |
124282 | |
124247 | |
124153 | |
124136 | Suppress popup for material status |
124074 | |
124050 | SD delivery creation dump with index eq 0 |
124033 | Categories in transit |
124006 | Requir. will not be ignored outside the ATP horiz. |
123888 | ARun / Sammellieferungen zu Umlagerbestellungen |
123862 | Size spread in requirements simulation |
123854 | |
123850 | Sequence of sales orders consuming PIR |
123839 | Billing: "System error: schedule & of order & /..." |
123806 | |
123724 | AFS Subcontracting header material NOGRID |
123718 | |
123712 | AFS Subcontracting with subsequent grid |
123657 | ATP check with purchase order/shipping notification |
123638 | Reactivation of PIRs after maintaining PIRs |
123572 | |
123558 | |
123552 | Update termination when using transaction J4a_ |
123522 | |
123514 | AFS Filter in AFS MRP |
123376 | Sorting of stock based on values |
123360 | SD delivery update picking Error with IDOC |
123324 | Shipping notification incorrect consumption |
123317 | |
123296 | Simulate update for Billing Documents |
123183 | Rescheduling horizont does not work like standard!! |
123039 | AFS Subcontracting lower value |
122954 | Wrong dates in MD05/MD06 for AFS material pur reqs |
122818 | |
122815 | AFS: consider scrap at function 'adapt size qties' |
122789 | |
122669 | program termination in XVBUK_XVBUP_XVBFA_AUFBAUEN |
122511 | |
122454 | Maximum lotsize to small |
122453 | |
122306 | |
122299 | Support the flag for PIR reduction from SD |
122293 | |
122286 | Components in pur.req. not displayed (subcontract.) |
122271 | |
122263 | |
122237 | MD04 old secondary requirements still displayed |
122200 | Wrong availability date in mrp overview |
122191 | |
122170 | Incorrect exception message/duplicate keys/dump |
122167 | |
122158 | Purchase requisitions not netted in MD04 display |
122150 | combined orders - combining with batch assignment |
122103 | |
122051 | Allow batch input for transaction J4A1 |
121989 | |
121922 | |
121817 | |
121671 | AFS: Adapt size qties if planned-order qty has chgd |
121646 | Item numbering when items are refered or deleted |
121620 | |
121581 | management tool didn't delete assignments |
121316 | |
121278 | |
121033 | |
120997 | |
120922 | |
120818 | |
120817 | V.25: wrong display Customer expected price |
120773 | |
120589 | |
120569 | |
120555 | MRP : rescheduling horizon ignored |
120496 | |
120452 | |
120436 | |
120427 | GR for subcontract. PO does not calculate properly |
120348 | Multiple partial deliveries with order reference |
120283 | |
120221 | |
120167 | |
120145 | |
119988 | |
119890 | |
119864 | |
119734 | Converting plan.ord. -> prod.ord. ATP check problem |
119658 | |
119591 | |
119491 | |
119434 | Display/change of longtext for VAS in order |
119359 | |
119315 | |
119296 | |
119268 | |
119257 | |
119178 | |
118798 | Dump SAPSQL_ARRAY_INSERT_DUPREC in MRP |
118797 | Planned order with quantity 0 |
118793 | |
118792 | |
118789 | Depending requirements are not shown |
118784 | |
118737 | |
118657 | combined orders - combining with batch assignment |
118653 | |
118616 | |
118613 | |
118565 | |
118422 | Size level horizont is using calender days |
118400 | |
118369 | |
118335 | |
118304 | |
118046 | |
117986 | |
117982 | |
117868 | |
117841 | |
117839 | |
117749 | MRP: PIR consumption with split delivery |
117684 | |
117681 | |
117654 | |
117538 | MRP: PO not displayed if partial confirmation exist |
116185 | |
113272 | MRP Program "SAPMJ3AD" Screen Source "0900" missing |
96172 | AFS: Release-/Migration Plan, Support package Status |